cluster.KOEB · 13 California clusters

Scalable Manufacturing Cluster Model, Starting from California

We The People are working to bring back the American Dream by turning locally grown and clean recycled materials (not hemp-only) into many products, and those products into homes, with apprenticeships and prosperity for all as our goal.

Status: research compiled · planned path, not a promise · no material hub is open

What's your local material? MII (Material Intelligence Institute) — its own site

In short: California’s 13 Jobs First regions already have fiber — farm leftovers, forest residue, or clean paper, cardboard and denim in every town. The gap we are studying is the making step close to home, so many small, locally owned shops can make what their neighbors need. Affordable homes are the goal. Each of the 13 clusters is planned to have its own local material hub. The Material Intelligence Institute (MII) — its own site is planned for materials intelligence and academies; it is not this site, and it is not the center of the cluster network.

The Mendota hub is in due diligence only, with no build dates. No lab is open yet, and no dates are set. Nothing here is for sale. Boards, collaboratives and colleges are named as public doors; none has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Idea on our list only — no region is still at this stage · Research drafted a regional proposal was written (Nov 17, 2026); no site chosen, no build dates · Due diligence Fresno / the Mendota hub only

The package · in her words, Nov 17, 2026

We Ask Them To Fix The Problem

Purpose, in her words: “If we want healthy food we have to restore our land first.” — Louisa Ip, Nov 17, 2026

We The People can ask officials to fix the problems in their hands. These are the pieces of that package, cited here by title. Sister studies are not hosted on this site; they are listed by title and date in Sources & Notes. Nothing here has been sent to an official, posted as a filing, or filed. Officials can be asked to fix the problem, never blamed.

Problem → Fix (a goal, not a promise)

Problem to fix: a planned path, not a promise A planned path, not a timeline and not a promise. It starts with disaster and poverty, then restoration, then jobs at local material hubs in each of the 13 clusters, then homes and apprenticeships, then prosperity for all as the goal. The Material Intelligence Institute is a linked piece for materials intelligence and academies, and has its own site; it is not the center of this path. No lab is open yet. No material hub is open. Problem to fix: a planned path, not a promise A planning graphic. Prosperity is the goal. No material hub is open yet. 1. Disaster / Poverty The problem 2. Restoration Land, soil, water, homes & people 3. Jobs Local material hubs 4. Homes & training Apprenticeships 5. Prosperity A goal, not a promise MII (its own site): materials intelligence + academies — a linked piece, not the center of this path.
Problem to fix: a planned path, not a promise A planned path, not a timeline and not a promise. It starts with disaster and poverty, then restoration, then jobs at local material hubs in each of the 13 clusters, then homes and apprenticeships, then prosperity for all as the goal. The Material Intelligence Institute is a linked piece for materials intelligence and academies, and has its own site; it is not the center of this path. No lab is open yet. No material hub is open. Problem to fix: a planned path, not a promise A planning graphic. Prosperity is the goal. No material hub is open yet. 1. Disaster / Poverty The problem 2. Restoration Land, soil, water, homes & people 3. Jobs Local material hubs 4. Homes & training Apprenticeships 5. Prosperity A goal, not a promise MII (its own site): materials intelligence + academies, a linked piece, not the center of this path.
Caption. Problem → Fix is a planning graphic, not a timeline and not a promise. The path now starts with disaster / poverty, then restoration, then jobs at a planned local material hub in each of the 13 clusters, then homes and apprenticeships, then prosperity for all as the goal. The Material Intelligence Institute (MII) appears only as a linked piece for materials intelligence and academies; it has its own site and is not the center of this path. Purpose, in her words (Nov 17, 2026): “If we want healthy food we have to restore our land first.” No lab is open yet. No material hub is open.

The Mycelium Manufacturing Network

The Mycelium Manufacturing Network A planned network diagram only, titled The Mycelium Manufacturing Network. An outline of California from the U.S. Census Bureau Cartographic Boundary File, 2024, one to five million scale, with only land shaded and ocean and bays left unshaded. Positions of 13 planned local material hubs are approximate, one in each official California Jobs First region, with links drawn between neighboring clusters. Around each planned hub, thin branching lines and small dots show an illustrative hub-and-spokes cluster of industry and town spokes and planned baby factories. Those spokes and dots are illustrative only; they are not chosen towns or sites, and no baby factory is built. They are drawn on land only. No material hub is open. The Mendota hub in Central San Joaquin is in due diligence only, with no build dates. The Material Intelligence Institute is shown as a small node in the ocean west of the state, linked to the network for materials intelligence and academies; it has its own site and is not the center. This is a planning graphic, not a survey map and not a map of open sites. The Mycelium Manufacturing Network Planned network only. 13 material hubs, one per cluster. None is open. Positions are approximate. Mendota (Central San Joaquin) is in due diligence only, with no build dates. Land outline: U.S. Census Bureau, 2024. Ocean and bays are not shaded. Pacific Ocean 1 2 3 4 5 6 7 8 9 10 11 12 13 1 N. State planned hub 2 Redwood planned hub 3 Capital planned hub 4 Sierra planned hub 5 Bay Area planned hub 6 N. SJ planned hub 7 Central SJ planned hub (Mendota: due diligence) 8 Central Coast planned hub 9 Kern planned hub 10 Los Angeles planned hub 11 Inland SoCal planned hub 12 Orange planned hub 13 S. Border planned hub MII its own site materials intelligence + academies (planned) linked, not the center Legend (planned only) Planned material hub Industry / town spokes Planned baby factory Illustrative spokes. Not chosen towns or sites. None is built. Links between clusters are a planning graphic, not built infrastructure. Thin branches and dots around each hub are illustrative. Spoke dots are not chosen towns or sites. No material hub is open, and no baby factory is built. Boundary: U.S. Census Bureau Cartographic Boundary File cb_2024_us_state_5m (1:5,000,000), vintage 2024, public domain. Equirectangular projection with cosine-of-latitude scaling. Hub positions are approximate.

On a narrow screen, scroll sideways to see the full map and every label.

The 13 planned material hubs
Cluster (Jobs First region)What is shownStatusNote
1 North StatePlanned local material hub (near Redding)Planned; none openJobs First region 1
2 RedwoodPlanned local material hub (near Eureka)Planned; none openJobs First region 2
3 CapitalPlanned local material hub (near Sacramento)Planned; none openJobs First region 3
4 SierraPlanned local material hub (near Sonora)Planned; none openJobs First region 4
5 Bay AreaPlanned local material hub (near Oakland)Planned; none openJobs First region 5
6 N. San JoaquinPlanned local material hub (near Stockton)Planned; none openJobs First region 6
7 Central San JoaquinPlanned local material hub (near Mendota)Due diligence only; no build datesJobs First region 7; no site chosen
8 Central CoastPlanned local material hub (near Salinas)Planned; none openJobs First region 8
9 Kern CountyPlanned local material hub (near Bakersfield)Planned; none openJobs First region 9
10 Los Angeles CountyPlanned local material hub (near Los Angeles)Planned; none openJobs First region 10
11 Inland SoCalPlanned local material hub (near Riverside)Planned; none openJobs First region 11
12 Orange CountyPlanned local material hub (near Santa Ana)Planned; none openJobs First region 12
13 Southern BorderPlanned local material hub (near San Diego)Planned; none openJobs First region 13
Caption. In Louisa’s words, a mycelium kingdom network, “just like what my book said” — Tone Deaf and Belligerent (The Mycelium Kingdom Series). This is her framing for a planned network, quoted from her words on Nov 19, 2026, PT. The book title is given in her attribution; the book was not opened in this pass ⚠. This map is titled The Mycelium Manufacturing Network. The state outline is the U.S. Census Bureau Cartographic Boundary File, cb_2024_us_state_5m, 1:5,000,000 (vintage 2024; file dated Apr 10, 2025; downloaded Nov 19, 2026, PT), public domain, projected here with a simple equirectangular projection and cosine-of-latitude scaling. Only land is shaded; ocean and bays are not shaded. Hub positions are approximate, placed near a well-known city in each official California Jobs First region (Redding, Eureka, Sacramento, Sonora, Oakland, Stockton, Mendota, Salinas, Bakersfield, Los Angeles, Riverside, Santa Ana, San Diego). This is not a survey map and not a count of open sites. Each of the 13 clusters is shown with its own planned local material hub. Links are drawn between neighboring clusters. Around each planned material hub, thin branching lines and small dots show a hub-and-spokes cluster (industry and town spokes, and planned baby factories). These spokes and dots are illustrative; they are not chosen towns or sites, and no baby factory is built. They were placed on land only, tested against the Census California polygon, in a rough area near each hub, with a fixed drawing seed so the picture stays the same. They do not follow official Jobs First region boundaries. No material hub is open. The Mendota hub in Central San Joaquin is in due diligence only, with no build dates. MII (Material Intelligence Institute) is a small linked node for materials intelligence and academies, drawn in the ocean west of the state, and has its own site; it is not the center of this network, and this page is not the MII site.

How a material hub works

This is the model already written in KOEB drafts, in plain words. It is a planned path, not a promise. No material hub is open. The Mendota hub is in due diligence only, with no build dates. No baby-factory kit is built yet.

The hub: first processing

Each of the 13 clusters is planned to have its own local material hub. The hub takes in local feedstock — farm fiber and other agricultural residue, hemp among many (this is not a hemp-only model), and clean recycled paper, cardboard, denim, and specified plastics — and does the first making step close to home: decortication, drying, sizing, and clean sorting, and, as planned, pelletizing or filament feedstock. The gap we are studying is that making step, not the supply. In the current cluster model, materials preparation, shared equipment, training, and testing belong in the hub.

The hub: equipment sharing

Equipment sharing is a core hub function, not an add-on. The planned hub hosts shared machines that small local businesses and baby factories can book — for example decortication, drying and sizing, pelletizing, filament extrusion, testing and QC, and shop tools — so no one has to buy costly machines alone. Louisa’s words (Nov 16, 2026): “small shops and share equipment hub.” The same habit is already written in KOEB drafts: “yes, and the share equipment that many can be their own boss later” (Builder-Entrepreneur module, Nov 10, 2026); and share the machines through a town equipment hub so many small shops can use them (Robot-Ready Cluster v0.1, Nov 17, 2026). No machine prices are listed here; none were sourced for this pass. This is a planned path, not a promise. No shared-equipment hub is open yet.

The spokes: many different industries

A hub is not one product line. The spokes are the different industries a cluster can serve. Louisa’s words (Nov 2, 2026): “different industries, modulization of spoke and wheel.” Examples already drafted in the KOEB model include building materials (hempcrete and hemp-lime — fire-resistant only — insulation, panels, and Living Wisdom modular homes); 3D-printer feedstock and filament (KOEB makes feedstock, not printers); textiles and fiber; bioplastics and composites; mycelium packaging; soil and restoration products such as biochar and compost; and robotics-ready shops that start on the shop floor. A town can add spokes over time; not every town needs every industry. Food and farm stay on a separate pathway and do not pass through recycled-material hubs.

3D-printed building is one planned spoke. Louisa’s words (Nov 20, 2026, 2:05 PM PT): “and we will be using 3D printer for building,” pointing to a public video by Ole Lehmann (@itsolelehmann, Nov 20, 2026, 5:45 AM PT). That video is a prompt, not a specification: it names no printer maker, and its cost and speed claims (including “up to 90% cheaper,” a “12 days” vs “years” graphic, “100 foot” towers, and “150 robots”) are ⚠ his claims, not confirmed here against a primary source. In the KOEB drafts already on disk, the hub supplies local printable mixes and feedstock; KOEB makes feedstock, not printers. Printers can be shared hub equipment, or owned by small print-build crews. A studied code path is UL 3401 (Outline of Investigation for 3D Printed Building Construction, issue 2, published Nov 28, 2022; scope re-read Nov 20, 2026, PT), which evaluates printed walls, panels, floors, roofs, and structures; it does not evaluate structural-design compliance, and its reports are for code officials using equivalency or alternate materials and methods. ICC-ES AC509 is a separate, concrete-only acceptance criteria (approved Aug 2023, editorially revised Aug 2024) for printed walls in one-story, single-unit homes, already cited in the Nov 10, 2026 printable-materials and red-tape drafts. In California, CRC Appendix BM covers some 3D-printed buildings but excludes printed concrete, and HCD proposed not to adopt BM statewide in the 2024 cycle; a printed home still needs a local adoption or an alternate-materials approval (same drafts). Hempcrete and hemp-lime, where used, are fire-resistant only. No vendor, lab, or official named here is a partner or endorser. This is a planned path, not a promise. We can ask building officials to say in writing how a printed wall of local material would be reviewed.

Modular container-size baby factories

Baby factories are container-sized product-making kits — not the hub itself. The hub can seed these units out to towns and small businesses. Louisa’s preference is many small, locally owned businesses, each running its own operations and customers. Shared equipment at the hub can support them. The design is modular: scale by adding units, town by town, rather than building one giant plant. The current correspondence model (Scalable Manufacturing Cluster Model v9, Nov 17, 2026) does not specify kit dimensions, costs, or throughput; those remain to be resolved ⚠, so they are not listed here. A related KOEB study (First three 20-ft container types v0.1, Nov 2, 2026) frames a standard 20-foot shipping container as a design envelope only. No unit is built yet.

The Material Intelligence Institute (MII) — its own site is planned for materials intelligence and academies: recipes, testing, and training support. It is linked to this network, not the center of it, and this page is not the MII site. No lab is open yet.

Hub, industry spokes, and baby factories

How a material hub works A planned diagram only, titled How a material hub works. It shows a local material hub doing first processing and hosting bookable shared equipment, then industry spokes (including a planned 3D-printed building spoke), then container-sized baby factories in towns run by independent small businesses. No hub is open. The Mendota hub is in due diligence only, with no build dates. The Material Intelligence Institute is a small linked node for materials intelligence and academies; it has its own site and is not the center. How a material hub works Planned only. No material hub is open. Mendota is in due diligence only, with no build dates. A planning graphic, not a promise. Baby factories are container-sized kits run by independent small businesses, not the hub itself. 1. Material hub First processing + shared equipment Local feedstock in; first processing: decortication, drying, sizing, sorting; pellets or filament, as planned. Also: bookable shared equipment — pelletizing, extrusion, testing/QC, and shop tools. Small shops and baby factories book the machines so no one has to buy them alone. 2. Industry spokes Many different industries, not one product line Building materials Filament / feedstock Textiles / fiber Bioplastics Mycelium packaging Soil / biochar Living Wisdom homes Robot-ready shops 3D-printed building Examples from KOEB drafts. A town can add spokes over time. 3. Baby factories In towns Container-size modular production kits, seeded out from the hub. Independent small businesses run them. Share costly equipment at the hub; scale by adding units, town by town. No kit is built yet. MII MII (its own site): materials intelligence + academies Linked, not the center of this path. No lab is open yet. Sources: Scalable Manufacturing Cluster Model v9 (Nov 17, 2026); First three 20-ft container types v0.1 (Nov 2, 2026); Factory as Product v0.1 (Oct 31, 2026). Goals, not promises.
How a material hub works A planned diagram only, titled How a material hub works, stacked for a narrow screen. It shows a local material hub doing first processing and hosting bookable shared equipment, then industry spokes (including a planned 3D-printed building spoke), then container-sized baby factories in towns run by independent small businesses. No hub is open. The Mendota hub is in due diligence only, with no build dates. The Material Intelligence Institute is a small linked node for materials intelligence and academies; it has its own site and is not the center. How a material hub works Planned only. No material hub is open. Mendota: due diligence only, no build dates. 1. Material hub First processing + shared equipment Local feedstock in; first processing close to home. Decortication, drying, sizing, sorting; pellets or filament feedstock, as planned. Shared equipment is bookable: extrusion, testing/QC, shop tools. Small shops book machines so no one has to buy them alone. 2. Industry spokes Many different industries Building materials Filament / feedstock Textiles / fiber Bioplastics Mycelium packaging Soil / biochar Living Wisdom homes Robot-ready shops 3D-printed building Examples from KOEB drafts. Add spokes over time. 3. Baby factories in towns Container-size modular kits, seeded out from the hub. Independent small businesses run them. Share costly equipment at the hub; scale by adding units. No kit is built yet. Goals, not promises. MII MII (its own site): materials intelligence + academies. Linked, not the center. Sources: Cluster model v9 (Nov 17, 2026); container types v0.1 (Nov 2, 2026).

On a narrow screen, the diagram stacks in three steps.

StepWhat it isStatusWritten in
Material hubFirst processing of local farm fiber, hemp among many, and clean recycled paper, cardboard, denim, and specified plastics (decortication, drying, sizing, sorting; pellets or filament feedstock as planned), plus equipment sharing as a core hub functionPlanned; none open. Mendota is in due diligence only, with no build datesCluster model v9, Nov 17, 2026; California hub-and-spoke v0.1, Oct 30, 2026
Equipment sharingThe hub hosts bookable shared equipment (for example decortication, drying and sizing, pelletizing, filament extrusion, testing and QC, and shop tools) so small local businesses and baby factories need not buy costly machines alonePlanned; no shared-equipment hub is open yet. No machine prices are listed; none were sourced for this passCluster model v9, Nov 17, 2026; Louisa, Nov 16, 2026, “small shops and share equipment hub”; Builder-Entrepreneur module, Nov 10, 2026; Robot-Ready Cluster v0.1, Nov 17, 2026
Industry spokesMany industries, not one line: building materials (fire-resistant hemp-lime/hempcrete, insulation, panels, Living Wisdom modular homes), filament/feedstock (KOEB makes feedstock, not printers), 3D-printed building, textiles, bioplastics, mycelium packaging, soil/biochar, robot-ready shopsPlanned examples, not a complete catalog and not a promiseFirst three container types v0.1, Nov 2, 2026 (§5, “one mother plant, many industry spokes”); cluster model v9; Robot-Ready Cluster v0.1, Nov 17, 2026; 3D-printed building spoke added Nov 20, 2026
3D-printed buildingA planned industry spoke: the hub supplies local printable mixes and feedstock (KOEB makes feedstock, not printers); printers can be shared hub equipment or owned by small print-build crews. Code paths already studied include UL 3401 (issue 2, Nov 28, 2022) for printed walls and other elements, and, separately, ICC-ES AC509 for printed concrete in one-story, single-unit homes. California’s CRC Appendix BM is not adopted statewidePlanned only; no print-build crew or shared construction printer is claimed here. Cost and speed figures in the Nov 20 Lehmann video are ⚠ his claims, not confirmedLouisa, Nov 20, 2026; UL 3401 scope, re-read Nov 20, 2026, PT; MII printable local-materials bench spec and California 3D-printed-homes red-tape map, both Nov 10, 2026; robotic/3D housing review, Nov 10, 2026
Baby factoriesContainer-sized product-making kits, seeded out to towns; independently operated by small, locally owned businesses; scale by adding units. Shared equipment at the hub can support themPlanned; no kit is built yet. Dimensions, costs, and throughput are not specified in v9 ⚠Cluster model v9, Nov 17, 2026; Factory as Product v0.1, Oct 31, 2026; Factory That Makes Factories v0.1 (Oct 31, 2026); Baby-Factory Business Model package, Nov 9, 2026
MII (its own site)Materials intelligence and academies — recipes, testing, and training supportPlanned; no lab is open yet. Linked, not the centerCluster model v9; MII has its own site
Caption. How a material hub works is a planning graphic, not a timeline and not a promise. It follows the KOEB model already on disk: a local material hub does first processing and hosts equipment sharing as a core function (bookable shared machines so small shops and baby factories need not buy costly machines alone); the spokes are many different industries, including a planned 3D-printed building spoke (the hub supplies local printable mixes and feedstock; KOEB makes feedstock, not printers; printers can be shared hub equipment or owned by small print-build crews; UL 3401, issue 2, Nov 28, 2022, is a studied evaluation path for printed walls and does not evaluate structural-design compliance; ICC-ES AC509 is a separate concrete-only criteria); baby factories are container-sized kits run by independent small businesses in towns (separate from the hub). No material hub is open. The Mendota hub is in due diligence only, with no build dates. No kit is built yet. Food and farm stay on a separate pathway from recycled-material hubs (v9). Hempcrete and hemp-lime, where used among home components, are fire-resistant only. MII is a linked materials-intelligence and academies piece with its own site; it is not the center, and this page is not the MII site. Sources opened or reused Nov 19, 2026, PT: Scalable Manufacturing Cluster Model v9 (Nov 17, 2026); First three 20-ft container types v0.1 (Nov 2, 2026); The Factory Is the Product v0.1 (Oct 31, 2026); The Factory That Makes Factories v0.1 (Oct 31, 2026); California Prototype Hub-and-Spoke v0.1 (Oct 30, 2026); Baby-Factory Business Model package (Nov 9, 2026); Robot-Ready Cluster v0.1 (Nov 17, 2026); Builder-Entrepreneur module (Nov 10, 2026); Louisa’s Nov 16, 2026 words, “small shops and share equipment hub.” 3D-printed building spoke added Nov 20, 2026, PT, after Louisa’s words “and we will be using 3D printer for building,” pointing to Ole Lehmann (@itsolelehmann, Nov 20, 2026, 5:45 AM PT); his cost and speed claims are ⚠ not confirmed here. Code-path sources reused or re-read this pass: UL 3401, issue 2, published Nov 28, 2022 (scope page re-read Nov 20, 2026, PT); MII printable local-materials bench spec v0.1 and California 3D-printed-homes red-tape map, both Nov 10, 2026; robotic and 3D housing review, Nov 10, 2026. ICC-ES AC509 dates (approved Aug 2023, editorially revised Aug 2024) and CRC Appendix BM / HCD 2024-cycle facts are from those Nov 10 drafts. Kit dimensions, costs, and throughput are omitted because v9 does not specify them ⚠.

Related KOEB studies (cited by title and date; not hosted on this site): Cluster model v9 · First three container types v0.1 · Factory as Product v0.1 · Factory That Makes Factories v0.1 · California hub-and-spoke v0.1 · Robot-Ready Cluster v0.1 · Builder-Entrepreneur + Shared Equipment, Nov 10, 2026 · Baby-Factory Business Model package · Robotic and 3D housing review, Nov 10, 2026 · MII printable local-materials bench spec v0.1 · Red-tape map for 3D-printed homes in California, Nov 10, 2026. The California hub-and-spoke draft (Oct 30, 2026) still carries a retired tagline on its own page; this site does not reuse it.

Idle properties to American prosperity

Abundance is on the public record. Idle and surplus public property, and money voters and Congress already approved, exist in every region. The gap is the door, not the supply. A property on a list is a lead, not an offer: each list has its own rules on who can use it and for what. Counts are what each public list showed on the date given; the lists change. No agency, owner, school or company named here has endorsed KOEB. No site has been chosen. The Mendota hub is in due diligence only, with no build dates.

The figures below are as compiled in the Nov 17, 2026 idle-properties map. Underlying HCD, DGS, GSA, LAO and other agency pages were not re-read on Nov 19, 2026 ⚠. The longer idle-properties study is cited by title and date in Sources & Notes.

What we found (headline numbers)

FindingNumberScope and dateSource
Local surplus land that cities and counties reported to the state3,042 parcels (1,906 listed as vacant), about 18,216 acres as reportedTable H rows for report year 2025, all 13 regions; acres are self-reported, and one Etna row (3,099 ac) looks out of scale ⚠HCD APR Table H CSV, data.ca.gov, file updated Nov 13, 2026, downloaded Nov 17, 2026
State excess land on the state's housing map23 sites, about 1,660 acres; 12 “accepting proposals,” 9 “under agreement,” 1 at a proposal deadline, 1 “not yet offered”Layer last edited Oct 29, 2026DGS “State_Surplus_Sites” map layer, read Nov 17, 2026; EO N-06-19 program
Federal idle buildings and land in California847 assets (688 buildings, about 4.14 million sq ft) reported unutilized, underutilized, or in the disposal pipelineFY2025 FRPP public data (as of Sept 30, 2025); excludes most Defense and security-withheld assetsGSA FRPP FY2025 public dataset, downloaded Nov 17, 2026; our filter and count ⚠
Federal buildings GSA has listed for accelerated sale in California3: 312 N Spring St, Los Angeles (751,791 sq ft); Frank Hagel Federal Building, Richmond (534,599 sq ft); John F. Shea Federal Building, Santa Rosa (71,702 sq ft)Listed Mar 31–May 8, 2025; still on the page Nov 17, 2026GSA accelerated-disposition page, opened Nov 17, 2026
Closed military base land still to transfer21,062 acres of 95,078 BRAC acres in California (Fort Ord alone: 7,778 acres)DoD data as reported by CRS in Apr 2019; later transfers not counted ⚠CRS R45705, Apr 25, 2019
State office space often unusedNearly 3.2 million sq ft, about $117 million spent on it in FY2024–2519 departments, 7 large state-owned office properties, under the 2-day in-office ruleCalifornia State Auditor, Report 2024-118, Aug 12, 2025
Voter-approved climate bond money not yet appropriated$3.752 billion of the $10 billion Prop 4 bond, including $561M wildfire and forest, $697M coastalAfter the 2026-27 budgetLAO, 2026-27 California Spending Plan: Natural Resources, Oct 5, 2026
Farmland leaving irrigated use in the San Joaquin ValleyAt least 500,000 acres may need to be fallowed under SGMA, even in the best casePPIC estimate, Sept 2023PPIC

Also on the record: 57 California schools closed in 2024–25 (30 traditional public, 27 charter), per EdSource citing the California Department of Education (Mar 2, 2026) ⚠ (the figure was read from a search excerpt; the page shows it as a graphic).

Statewide idle-property headlines

Each panel has its own unit and its own scale starting at zero. These four numbers are not comparable to one another on a single axis.

Local surplus · HCD Table H 2025

3,042 parcels

1,906 vacant; about 18,216 acres. Other 1,136 is our subtraction ⚠.

Local surplus parcels, vacant and other Local surplus parcels in California from HCD Table H, report year 2025: 3,042 parcels total, of which 1,906 are vacant and 1,136 are other parcels. The 1,136 figure is our subtraction. Scale starts at zero. Units: parcels. 0 3,042 parcels 1,906 vacant 1,136 other ⚠ Vacant 1,906 Other 1,136 ⚠

State excess · DGS, last edited Oct 29, 2026

23 sites

About 1,660 acres still open. Central San Joaquin has 0 open (Fresno and Reedley already awarded). The bar scale is 0 to 23 sites — the whole count, not a share of a larger total.

State excess sites still open 23 state excess sites still open, about 1,660 acres. DGS layer last edited October 29, 2026. Scale starts at zero and ends at 23 sites. 0 23 sites 23 sites

Federal idle · FRPP FY2025 as of Sept 30, 2025

847 assets ⚠

688 buildings; 4,139,463 sq ft. Our filter ⚠. Orange County: 0, as on the card. The bar scale is 0 to 847 assets — the whole count, not a share of a larger total.

Federal idle assets, our filter 847 federal idle assets, of which 688 are buildings, totaling 4,139,463 square feet. FRPP fiscal year 2025 as of September 30, 2025, our filter. Scale starts at zero and ends at 847 assets. 0 847 assets 847 assets ⚠

BRAC land still to transfer · CRS, Apr 25, 2019

21,062 acres ⚠

Of 95,078 BRAC acres in California (Fort Ord alone: 7,778). Later transfers not counted ⚠.

BRAC acres in California still to transfer Of 95,078 BRAC acres in California, 21,062 acres were still to transfer as reported by CRS on April 25, 2019. The 74,016 already-transferred remainder is our subtraction, and later transfers are not counted. Scale starts at zero. Units: acres. 0 95,078 acres 21,062 left 74,016 ⚠ Still to transfer 21,062 Already transferred 74,016 ⚠
Caption. Statewide idle-property headline numbers already on this page. Each panel uses its own unit and its own scale starting at zero. The four figures are not plotted on one shared axis, because parcels, sites, assets and acres are not the same thing. Local surplus: 3,042 parcels (1,906 vacant) from HCD Table H, report year 2025; vacant and other parcels are parts of that total (the 1,136 other-parcel remainder is our subtraction ⚠). State excess: 23 sites, about 1,660 acres, DGS layer last edited Oct 29, 2026. Federal idle: 847 assets (688 buildings, 4,139,463 sq ft), FRPP FY2025 as of Sept 30, 2025, our filter ⚠. BRAC land still to transfer: 21,062 acres of 95,078 in California (CRS R45705, Apr 25, 2019); the 74,016 already-transferred remainder is our subtraction, and later transfers are not counted ⚠. A property on a list is a lead, not an offer. Underlying list pages were not re-read on Nov 19, 2026 ⚠.

Local surplus parcels by region

Local surplus parcels by region (our counts ⚠) Horizontal bar chart of local surplus parcels by California Jobs First region, from HCD Table H, report year 2025, our regional grouping. Inland SoCal 854, Bay Area 546, Los Angeles County 319, Kern County 266, Orange County 261, North State 170, Southern Border 144, Northern San Joaquin 135, Central Coast 130, Capital 90, Central San Joaquin 73, Redwood 51, Sierra 3. Total 3,042 parcels. Scale starts at zero. Units: parcels. Local surplus parcels by region (our counts ⚠) 0 0 200 400 600 800 parcels 1 North State 170 2 Redwood 51 3 Capital 90 4 Sierra 3 5 Bay Area 546 6 N. San Joaquin 135 7 Central San Joaquin 73 8 Central Coast 130 9 Kern County 266 10 Los Angeles County 319 11 Inland SoCal 854 12 Orange County 261 13 Southern Border 144

On a narrow screen, scroll sideways to see the full scale and every label.

Data table
RegionLocal surplus parcelsSourceNote
1 North State170HCD Table H, report year 2025Our grouping ⚠
2 Redwood51HCD Table H, report year 2025Our grouping ⚠
3 Capital90HCD Table H, report year 2025Our grouping ⚠
4 Sierra3HCD Table H, report year 2025Our grouping ⚠
5 Bay Area546HCD Table H, report year 2025Our grouping ⚠
6 N. San Joaquin135HCD Table H, report year 2025Our grouping ⚠
7 Central San Joaquin73HCD Table H, report year 2025Our grouping ⚠
8 Central Coast130HCD Table H, report year 2025Our grouping ⚠
9 Kern County266HCD Table H, report year 2025Our grouping ⚠
10 Los Angeles County319HCD Table H, report year 2025Our grouping ⚠
11 Inland SoCal854HCD Table H, report year 2025Our grouping ⚠
12 Orange County261HCD Table H, report year 2025Our grouping ⚠
13 Southern Border144HCD Table H, report year 2025Our grouping ⚠
Statewide total3,042HCD Table H, report year 2025Matches the page
Caption. Local surplus parcels by California Jobs First region, from HCD Table H (report year 2025), as already shown on this page. Counts are our own regional grouping ⚠. Statewide total: 3,042 parcels (1,906 vacant; about 18,216 acres). North State’s acreage includes Etna’s 3,099-acre parcel ⚠. Scale starts at zero. Units: parcels. A property on a list is a lead, not an offer. Underlying list pages were not re-read on Nov 19, 2026 ⚠. Source: Table H 2025, grouped in the Nov 17, 2026 idle-properties work file.

Which idle property fits which project

Fit is our planning judgment, a goal to test site by site. Every use has to pass each list’s legal rules, zoning, soil and building checks first.

ProjectBest-fit idle property typesWhy it fitsMain rule to check first
Materials plants and clean-recycling nodes in every town (locally grown fibers and residues plus clean recycled paper, cardboard, denim and textiles; many products, not hemp-only)Local surplus parcels in industrial and commercial use; closed plants and mills; brownfields after cleanup; closed-base industrial landClose to where straw, prunings, hulls, paper and textiles already areSurplus Land Act notice process (Gov. Code §54222); local zoning; air district permits; brownfield cleanup status
Local cluster material hubs, and MII (its own site) academy / materials-intelligence spaceUnused state office floors; closed school sites; federal surplus buildings for education; underused federal labs and offices; local surplus parcelsClassrooms, labs, shops and test benches already built (a goal to test site by site)Federal Real Property Assistance for education (34 CFR Part 12, via the KOEB Fresno federal-land file) ⚠; school-district surplus rules ⚠ not read this pass
Healthy housing (fire-resistant hempcrete, fiber boards, cellulose and denim insulation, lime and earth plasters)State excess sites (EO N-06-19); local surplus land (Surplus Land Act prefers affordable housing)These lists exist for housingState program needs a lead developer with California affordable-housing experience; a team can include other members (state guidelines, Oct 1, 2024). Affordable homes remain a goal.
Land restoration (Moss Landing, forest and coastal fire areas, salty or overdrafted farmland)Fallowed SGMA farmland; burned public forest land; repurposed farmland under MLRPRestoration is the use; fiber can follow where soil tests cleanSoil tests first; plants grown to pull metals out of soil are tested waste and never go into homes, food, feed or compost (restoration plan rule)
Robot-Ready shops and shared equipment hubsUnderused federal and state buildings; local surplus public-facility parcelsMany small shops share machines in one hub (a goal)Lease terms; power capacity ⚠
Clean food from restored landFallowed farmland; surplus parcels “presently being farmed”Her words: “If we want healthy food we have to restore our land first.”Water rights and SGMA plans ⚠

The money already approved: what could be re-aimed

Not the centerpiece: money. We are not asking for new money. These pots were already approved by voters, the Legislature or Congress. We can ask the officials who hold them to point what is already there at the problems already in front of them.

FundAmount on recordWhat it could fitDate and source
Prop 4 Climate Bond (2024), total not yet appropriated$3.752B of $10B left after 2025-26 ($3.462B) and 2026-27 ($2.711B)Restoration, fire, coastal, farmlandOct 5, 2026 · LAO
Of that Prop 4 balance (selected pots)Wildfire and Forest Resilience $561M left of $1.5B; Coastal Resilience $697M left of $1.2B; Multibenefit Land Repurposing (MLRP) $102M left; infrastructure for vegetative waste $24M left; regional farm equipment sharing $14M in 2026-27; increasing land access and tenure $25M leftFire-area restoration; Moss Landing and coastal work; fallowed-farmland restoration; residue-to-materials lines; shared-equipment hubs; getting idle land into new farmers' handsOct 5, 2026 · LAO
California Jobs FirstCatalyst $14M per region, Mar 2024; implementation round 1 $80M, Aug 2025; final tranche $48.5M, Aug 26, 2026Regions already have federally accepted plans (CEDS)Aug 26, 2026 · Jobs First
CalRecycle organics“nearly $425 million ($105.8 million General Fund)” for organic-waste infrastructure and new programsClean-recycling nodes; compost; fiberGovernor’s Budget Summary 2026-27 (Jan 2026; enacted amount ⚠)
EPA Brownfields, California FY2026More than $15.3M (Multipurpose, Assessment, Cleanup) + $500,000 to Fresno’s revolving loan fundCleanup of idle sites before materials-plant or housing useJun 23, 2026 · EPA
HUD CDBG-DR$416,597,000 to the State of California for the 2023–24 winter storms; for the Jan 2025 LA fires: none found ⚠Disaster rebuilding with healthy materials (a goal)Jan 16, 2025 notice; checked Nov 17, 2026 · 90 FR; LA County filing ⚠
State office space already paid for~$117M in FY2024–25 for ~3.2M sq ft often unusedCluster maker hubs, and academy / materials-intelligence space at MII (its own site) (a goal)Aug 12, 2025 · California State Auditor, Report 2024-118

Also on the record, as programs rather than a new ask: USDA Rural Development B&I was listed “Open” on Nov 17, 2026, and the SBA SBIC bonus-leverage rule (91 FR 73665, effective Nov 17, 2026) counts small manufacturers and rural areas; comments close Dec 17, 2026. Details are in the statewide roll-up.

The money already approved (Prop 4)

Prop 4 money not yet appropriated after the 2026-27 budget Stacked bar of Proposition 4 Climate Bond money not yet appropriated after the 2026-27 budget: 3.752 billion dollars total. Wildfire and Forest Resilience 561 million dollars, Coastal Resilience 697 million dollars, and a remainder of 2.494 billion dollars that is our subtraction and still includes other named pots. Wildfire and coastal amounts are portions of the 3.752 billion, not additional money. Source: Legislative Analyst's Office, October 5, 2026. Scale starts at zero. Units: billions of dollars. Prop 4 money not yet appropriated after the 2026-27 budget Scale: 0 to $3.752B . Scale starts at zero. Wildfire $561M Coastal $697M Remainder ⚠ $2.494B ⚠ 0 $3.752B Wildfire and Forest Resilience: $561M Coastal Resilience: $697M Remainder (our subtraction): $2.494B ⚠ ⚠

On a narrow screen, scroll sideways to see the full scale and every label.

Data table
Part of the $3.752B leftAmountDate and sourceNote
Wildfire and Forest Resilience, left of $1.5B$561 millionLAO, Oct 5, 2026A portion of the $3.752B, not extra
Coastal Resilience, left of $1.2B$697 millionLAO, Oct 5, 2026A portion of the $3.752B, not extra
Remainder$2.494 billion ⚠Our subtraction, Nov 19, 2026Still includes MLRP, vegetative waste, equipment sharing, and land access
Total not yet appropriated$3.752 billionLAO, Oct 5, 2026Of the $10 billion Prop 4 bond
Caption. Proposition 4 (2024) Climate Bond money not yet appropriated after the 2026-27 budget: $3.752 billion of $10 billion (LAO, 2026-27 California Spending Plan: Natural Resources, Oct 5, 2026). Wildfire and Forest Resilience $561 million left of $1.5 billion, and Coastal Resilience $697 million left of $1.2 billion, are portions of that $3.752 billion, not additional money. The $2.494 billion remainder is our subtraction ⚠ and still includes other named pots on this page (MLRP $102 million, vegetative-waste infrastructure $24 million, regional farm equipment sharing $14 million in 2026-27, and increasing land access $25 million). Scale starts at zero. Units: billions of dollars.

What We The People can ask officials to fix

In Louisa’s words (Nov 17, 2026): “We ask to set us Free so that we can govern and care for our communities… Let us grow and build with liberty without chain.” “let the servant minded to serve We The People.”

We can ask officials to fix the problems in their hands. We The People scissors and keys: scissors cut red tape, keys open doors. Our goal is local action that does not need permission here and permission there: one clear door, published rules, and the same answer for every town. This is a short form of the asks in the idle-properties study cited in Sources & Notes.

Door one: California (first)

Door two: federal (second)

We can ask in public, in writing and at public meetings, and we can track the answers in the open. We have not asked yet. In Louisa’s framing, tax dollars should fix problems instead of creating more problems to ask for more funding.

Jump to a cluster

Numbers are the official California Jobs First region numbers (page opened Nov 17, 2026; the URL returned HTTP 200 on Nov 19, 2026). All 13 regional plans were accepted by the U.S. EDA as Comprehensive Economic Development Strategies (CEDS) on Apr 10, 2025. That is a public-door fact, not an endorsement of KOEB.

#RegionCountiesStage
1North StateButte, Glenn, Lassen, Modoc, Plumas, Shasta, Sierra, Siskiyou, Tehama, TrinityResearch drafted
2RedwoodDel Norte, Humboldt, Lake, Mendocino (and Tribal lands)Research drafted
3CapitalColusa, El Dorado, Nevada, Placer, Sacramento, Sutter, Yolo, YubaResearch drafted
4SierraAlpine, Amador, Calaveras, Inyo, Mariposa, Mono, TuolumneResearch drafted
5Bay AreaAlameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, SonomaResearch drafted
6Northern San JoaquinMerced, San Joaquin, StanislausResearch drafted
7Central San Joaquin (the model)Fresno, Kings, Madera, TulareDue diligence (Fresno / Mendota only)
8Central CoastMonterey, San Benito, San Luis Obispo, Santa Barbara, Santa Cruz, VenturaResearch drafted
9Kern CountyKernResearch drafted
10Los Angeles CountyLos AngelesResearch drafted
11Inland SoCalRiverside, San BernardinoResearch drafted
12Orange CountyOrangeResearch drafted
13Southern BorderImperial, San DiegoResearch drafted

Apprenticeship (consistent version, not legal advice; checked Nov 17, 2026). California is a DOL Office of Apprenticeship (OA) state, not a recognized State Apprenticeship Agency. DOL withdrew recognition for federal purposes on Jan 31, 2007 (72 FR 9590, Mar 2, 2007). Employers can register a program directly with the federal office. The state’s Division of Apprenticeship Standards (DAS) and the California Apprenticeship Council register programs for state purposes (Labor Code §1777.5). A program can hold both. Whether the state’s needs test still applies today is ⚠ unverified. Mechatronics Technician is recognized as an apprenticeable occupation (DOL OA Bulletin 2013-07, Jan 23, 2013; PDF ⚠ did not load from this machine on Nov 19 or Nov 20, 2026 (HTTP 403)). Robotics Technician appears on apprenticeship.gov’s American Manufacturing Apprenticeship Incentive Fund approved occupations list (updated Oct 14, 2026; not re-read this pass ⚠).

Robot-Ready (every region). Robots work alongside people. A human is on every crew. We start with shop-floor machines (we make feedstock, not printers), share them through a town equipment hub so many small shops can use them, and train people to run, fix and program them. Humanoids stay on a watch list until a dated public offer to buy or lease them for job-site use is on the record. ⚠ No such offer was found as of Nov 17, 2026. No vendor, college or school named in the Robot-Ready work is a partner or endorser.

Idle public property. Counts below are from the Nov 17, 2026 idle-properties map (HCD Table H report year 2025; DGS state surplus layer last edited Oct 29, 2026; GSA FRPP FY2025 as of Sept 30, 2025; BRAC acres from the CRS Apr 2019 table ⚠). A property on a list is a lead, not an offer. Underlying list pages were not re-read on Nov 19, 2026 ⚠.

Land restoration. Example fires are not every fire in the region. Public recovery cost and homes rebuilt are ⚠ not found yet, unless a card says otherwise. Figures come from the Nov 17, 2026 fire-damage draft; some CAL FIRE top-20 figures were read from a mirrored PDF ⚠, and underlying incident pages were not re-opened on Nov 19, 2026 ⚠.

The 13 clusters

These are the 13 official California Jobs First regions. On cluster.KOEB, each is a planned cluster with its own local material hub. No material hub is open yet. The Mendota hub, in Central San Joaquin, is in due diligence only, with no build dates.

Fire damage by region (examples, not every fire)

Example fires on the region cards (acres burned, not every fire) Horizontal bar chart of acres burned for the example fires named on the region cards, not every fire. Largest examples: August Complex 2020, 1,032,648 acres (Redwood, flagged); Dixie 2021, 963,309 acres (North State); Park 2024, 429,603 acres (North State); SCU Complex 2020, 396,624 acres (Bay Area, flagged). Nineteen example fires are shown. Scale starts at zero. Units: acres. Example fires on the region cards (acres burned, not every fire) 0 0 250,000 500,000 750,000 1,000,000 acres August Complex 2020 · Redwood ⚠ 1,032,648 Dixie 2021 · North State 963,309 Park 2024 · North State 429,603 SCU Complex 2020 · Bay Area ⚠ 396,624 Creek 2020 · Central SJ ⚠ 379,895 LNU Complex 2020 · Bay Area ⚠ 363,220 North Complex 2020 · Capital 318,935 Thomas 2017 · Central Coast ⚠ 281,893 Cedar 2003 · S. Border 273,246 Rim 2013 · Sierra ⚠ 257,314 Caldor 2021 · Capital ⚠ 221,835 Witch 2007 · S. Border 197,990 Camp 2018 · North State 153,336 Woolsey 2018 · Central Coast 96,949 Old Fire 2003 · Inland SoCal 91,281 CZU Complex 2020 · Central Coast 86,509 Tubbs 2017 · Bay Area 36,807 Palisades 2025 · Los Angeles 23,448 Eaton 2025 · Los Angeles 14,021

On a narrow screen, scroll sideways to see the full scale and every label.

Data table
Example fireYearRegion on the cardAcres
August Complex ⚠2020Redwood1,032,648 ⚠
Dixie2021North State963,309
Park2024North State429,603
SCU Lightning Complex ⚠2020Bay Area396,624 ⚠
Creek ⚠2020Central San Joaquin379,895 ⚠
LNU Lightning Complex ⚠2020Bay Area363,220 ⚠
North Complex2020Capital318,935
Thomas ⚠2017Central Coast281,893 ⚠
Cedar2003Southern Border273,246
Rim ⚠2013Sierra257,314 ⚠
Caldor ⚠2021Capital221,835 ⚠
Witch2007Southern Border197,990
Camp2018North State153,336
Woolsey2018Central Coast96,949
Old Fire2003Inland SoCal91,281
CZU Lightning Complex2020Central Coast86,509
Tubbs2017Bay Area36,807
Palisades2025Los Angeles County23,448
Eaton2025Los Angeles County14,021
Caption. Example fires named on the region cards, not every fire in California or in each region. Acres are as cited on this page from the Nov 17, 2026 fire-damage draft. Bars marked ⚠ were read from a mirrored CAL FIRE Jan 13, 2022 top-20 PDF, or share that citation. The SCU Complex is plotted once, using the Bay Area figure of 396,624 acres; it also reached Northern San Joaquin, but acres by county are ⚠ not found yet, so that region has no bar. Kern County and Orange County have no documented land-damage item yet ⚠ and are omitted — that is not a finding of zero acres burned. The Moss Landing battery-plant fires are omitted because damaged acreage is ⚠ not found yet. Caldor is listed with the Capital region as on the card; Amador and Alpine (Sierra region) also burned. Scale starts at zero. Units: acres. Underlying incident pages were not re-opened on Nov 19, 2026 ⚠.

Local feedstock: registered hemp acres by region

Registered hemp acres by region (registered is not harvested) ⚠ Horizontal bar chart of registered industrial hemp acres by California Jobs First region, as of November 4, 2026, from the CDFA Industrial Hemp Registration Summary, our regional sums. Central San Joaquin 2,805.10 acres is the largest. Sierra, Los Angeles County and Orange County are 0 because none are listed. Statewide total 4,808.61 registered acres. Registered is not harvested. Scale starts at zero. Units: registered acres. Registered hemp acres by region (registered is not harvested) ⚠ 0 0 500 1,000 1,500 2,000 2,500 3,000 registered acres 1 North State 93.19 2 Redwood 0.50 3 Capital 354.57 4 Sierra 0 5 Bay Area 329.20 6 N. San Joaquin 46 7 Central San Joaquin 2,805.10 8 Central Coast 364.23 9 Kern County 415.69 10 Los Angeles County 0 11 Inland SoCal 206.56 12 Orange County 0 13 Southern Border 193.57

On a narrow screen, scroll sideways to see the full scale and every label.

Data table
RegionRegistered acresAs ofNote
1 North State93.19CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
2 Redwood0.50CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
3 Capital354.57CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
4 Sierra0CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
5 Bay Area329.20CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
6 N. San Joaquin46CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
7 Central San Joaquin2,805.10CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
8 Central Coast364.23CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
9 Kern County415.69CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
10 Los Angeles County0CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
11 Inland SoCal206.56CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
12 Orange County0CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
13 Southern Border193.57CDFA, Nov 4, 2026Our sum ⚠; registered, not harvested
Statewide total4,808.61CDFA, Nov 4, 2026Matches the page
Caption. Registered industrial hemp acres by California Jobs First region, as of Nov 4, 2026 (CDFA Industrial Hemp Registration Summary). Regional totals are our sums from the statewide county file used in the regional drafts ⚠. Registered is not harvested. Sierra, Los Angeles County and Orange County have no registered acres listed and are shown as 0. Statewide total: 4,808.61 registered acres. Hemp is one source among many; we are not hemp-only. Scale starts at zero. Units: registered acres.

Documented priority needs at a glance

This is a short index of needs already documented in the Nov 17, 2026 regional drafts and on the cards below, not a ranking and not a complete needs assessment. Regional RHNA housing allocations were ⚠ not compiled in these drafts. Idle counts are the same figures already on the cards (our grouping ⚠).

Highest county unemployment in each region, September 2026 Horizontal bar chart of the highest county unemployment rate in each of the 13 California Jobs First regions for September 2026, not seasonally adjusted. These are county rates, not regional averages. Imperial County 20.8 percent is the highest of California's 58 counties. Alpine 10.0, Tulare 9.8, Merced 8.1 and Kern 7.9 percent are marked because those figures were read from a search snapshot of the EDD PDF. Scale starts at zero. Units: percent of the labor force. Highest county unemployment in each region, September 2026 0 percent of the labor force 0 5 10 15 20 25 13 S. Border · Imperial 20.8% 4 Sierra · Alpine ⚠ 10.0% ⚠ 7 Central SJ · Tulare ⚠ 9.8% ⚠ 3 Capital · Colusa 8.6% 6 N. San Joaquin · Merced ⚠ 8.1% ⚠ 9 Kern County ⚠ 7.9% ⚠ 2 Redwood · Lake 7.1% 1 North State · Siskiyou 6.7% 11 Inland SoCal · Riverside 5.9% 8 Central Coast · San Benito 5.7% 5 Bay Area · Solano 5.3% 10 Los Angeles County 4.5% 12 Orange County 4.3%

On a narrow screen, scroll sideways to see the full scale and every label.

Highest county unemployment, September 2026 (not a regional average)
RegionCounty shownRate (Sep 2026, NSA)Source in the drafts
1 North StateSiskiyou6.7% of 16,770EDD, via the North State draft, Nov 17, 2026
2 RedwoodLake7.1% of 26,900EDD, via the Redwood draft, Nov 17, 2026
3 CapitalColusa8.6% of 11,780EDD, via the Capital draft, Nov 17, 2026
4 SierraAlpine10.0% of 420 ⚠EDD Report 400C, via Batch A; PDF read through a search snapshot ⚠
5 Bay AreaSolano5.3%EDD, via the Bay Area draft, Nov 17, 2026
6 N. San JoaquinMerced8.1% ⚠EDD Report 400C, via Batch A; PDF read through a search snapshot ⚠
7 Central San JoaquinTulare9.8% ⚠EDD Report 400C, via Batch A; PDF read through a search snapshot ⚠
8 Central CoastSan Benito5.7%EDD, via the Central Coast draft, Nov 17, 2026
9 Kern CountyKern7.9% ⚠EDD Report 400C, via Batch A; PDF read through a search snapshot ⚠
10 Los Angeles CountyLos Angeles4.5%EDD LAUS via FRED, via the Los Angeles draft, Nov 17, 2026
11 Inland SoCalRiverside5.9%EDD LAUS via FRED, via the Inland SoCal draft, Nov 17, 2026
12 Orange CountyOrange4.3%EDD LAUS via FRED, via the Orange County draft, Nov 17, 2026
13 Southern BorderImperial20.8% (highest of 58 counties)EDD / BLS via FRED, via the Southern Border draft, Nov 17, 2026
Caption. Highest county unemployment rate in each California Jobs First region, September 2026, not seasonally adjusted. These are county rates, not regional averages (we did not average the counties). Imperial County 20.8% was the highest of California’s 58 counties (EDD / BLS via FRED, as cited in the Southern Border draft and the statewide roll-up, Nov 17, 2026). Bars marked ⚠ (Alpine 10.0%, Tulare 9.8%, Merced 8.1%, Kern 7.9%) come from EDD Report 400C as cited in Batch A, Nov 17, 2026; that PDF was read through a search snapshot ⚠. Other rates are from the same September 2026 EDD series as cited in Batches B–D, Nov 17, 2026. Scale starts at zero. Units: percent of the labor force. One month only.
RegionA documented priority needIdle public-property lead already on the cardSource and date
1 North StateMaking step for straw, shells and wood; fire recovery (homes rebuilt ⚠ not found)170 local surplus parcels (158 vacant)North State draft / Table H 2025 / fire-damage draft, Nov 17, 2026
2 RedwoodPermit path for natural building materials (named in the regional plan)51 local surplus parcels (28 vacant)Redwood draft, Nov 17, 2026 / Table H 2025
3 CapitalStraw sizing and Sacramento urban sorting; training seats in Colusa, Sutter and Yuba90 local surplus parcels (83 vacant)Capital draft, Nov 17, 2026 / Table H 2025
4 SierraNo fiber processing; small local surplus list, larger federal idle list3 local surplus parcels (0 vacant); 98 federal idle assetsSierra draft, Nov 17, 2026 / Table H 2025 / FRPP FY2025
5 Bay AreaMaking step for a large recycled stream; fire rebuild (homes rebuilt ⚠ not found)546 local surplus parcels (292 vacant)Bay Area draft, Nov 17, 2026 / Table H 2025
6 N. San JoaquinBuilding-materials branch in the plan’s Circular Bioeconomy priority135 local surplus parcels (47 vacant); 3 state excess sites (860.7 ac)Northern San Joaquin draft, Nov 17, 2026 / Table H 2025 / DGS Oct 29, 2026
7 Central San JoaquinDrying and sizing ⚠; Tulare unemployment 9.8% ⚠; Mendota is due diligence only73 local surplus parcels (44 vacant); 0 state sites openCentral San Joaquin draft, Nov 17, 2026 / Table H 2025
8 Central CoastRestore fire areas and Moss Landing (acreage there ⚠ not found); processing130 local surplus parcels (37 vacant)Central Coast / Moss Landing drafts, Nov 17, 2026 / Table H 2025
9 Kern CountyFiber processing next to existing binders; no documented land-damage item yet ⚠266 local surplus parcels (168 vacant); 3,300 acKern draft, Nov 17, 2026 / Table H 2025
10 Los Angeles CountyEaton and Palisades rebuild (homes rebuilt ⚠ not found); textile making step319 local surplus parcels (187 vacant)Los Angeles draft / fire-damage draft, Nov 17, 2026 / Table H 2025
11 Inland SoCalWarehouse-to-workshop path; fire code for fiber ⚠854 local surplus parcels (555 vacant) — largest local listInland SoCal draft, Nov 17, 2026 / Table H 2025
12 Orange CountyCircular materials for small shops (plan language); smallest grown base261 local surplus parcels (194 vacant); federal idle 0Orange County draft, Nov 17, 2026 / Table H 2025
13 Southern BorderImperial unemployment 20.8%; Brawley kiln status ⚠ unknown144 local surplus parcels (113 vacant); 2 state excess sites (419.7 ac)Southern Border draft, Nov 17, 2026 / Table H 2025 / DGS Oct 29, 2026

The cards below spell out 3 to 5 needs and one draft idle-property proposal for each region. Every proposal is a desk draft. We The People can ask officials to fix the problem.

Region 1 · California Jobs First

North State

Research drafted

Counties: Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Sierra, Siskiyou, Tehama, Trinity.

Local materials: Rice straw — Butte harvested 85,400 acres of rice in 2022; 2022 was a drought year, so this is likely low ⚠. Nut hulls and shells — for example Butte almond hulls 52,400 t, Glenn 43,800 t (2022). Forest and sawmill residue — 2022 timber harvests include Plumas 384,000 MBF, Siskiyou 144,000 MBF, Butte 80,800 MBF, Lassen 70,700 MBF and Shasta 68,400 MBF. Harvest volume is not residue volume ⚠. Clean paper, cardboard and denim are in every town; county-level material breakdown ⚠. Already-built sites (the Willows straw-board plant and the closed Weed veneer mill) are questions a town can study; no site is chosen here. What remains at Willows is unknown ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines on this region's rice straw, shells and forest residue. Already-built sites (the Willows straw-board plant and the closed Weed veneer mill) are questions a town can study; no site is chosen here. Share the machines through a town equipment hub so many small shops can use them.

Land restoration. We The People can ask officials to fix the problem. Example fires, not every fire in this region: Park (2024), 429,603 acres, 713 structures (from the Nov 17, 2026 fire-damage draft, citing the CAL FIRE Park Fire incident page, last updated Jul 29, 2025); Dixie (2021), 963,309 acres, 1,311 structures (same draft, citing the CAL FIRE Dixie Fire incident page, last updated Oct 14, 2022); and Camp (2018), 153,336 acres, 18,804 structures, 85 deaths (same draft, citing Cal OES / CAL FIRE, “Top 20 Most Destructive California Wildfires,” Oct 9, 2025). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 170 parcels (158 vacant) · 3,515 ac ⚠ (includes one 3,099-ac Etna row). State excess: 1 site · 1.7 ac. Federal idle: 113 assets (109 buildings) · 170,943 sq ft · USDA 79, Interior 34. BRAC still to transfer (CRS Apr 2019 table) ⚠: Sierra Army Depot 4,488 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore burned land after the example fires already on this card — Park (2024) 429,603 acres, Dixie (2021) 963,309 acres, and Camp (2018) 153,336 acres and 18,804 structures — so water and soil can work again. Public recovery cost and homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026).
  • The making step is the gap, not the supply: rice straw, nut shells and forest residue need drying, sizing and a path to products, not only power (statewide roll-up and North State draft, Nov 17, 2026).
  • Reuse already-built sites as questions a town can study: the Willows straw-board plant (what remains after the May 2026 auction is ⚠ unknown) and the Roseburg Weed veneer mill, closed Dec 3, 2025, with about 140 jobs (North State draft, Nov 17, 2026). No site is chosen here.
  • Work and training seats where the need is documented: Siskiyou County unemployment was 6.7% of a 16,770 labor force in September 2026, preliminary and not seasonally adjusted (EDD, via the North State draft, Nov 17, 2026).
  • Put idle public property to a tested use: 170 local surplus parcels (158 vacant; about 3,515 acres, including Etna’s 3,099-acre row ⚠) and 113 federal idle assets (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Redeem already-built North State shops (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 158 vacant of 170, or an already-built site such as the Willows straw-board plant or the closed Weed veneer mill, as a lead only, becomes a shared shop-floor for rice straw, shells and forest residue — many products, not hemp-only — and an apprentice training yard (a goal). Sierra Army Depot’s 4,488 BRAC acres still to transfer are a lead, not an offer (CRS R45705, Apr 25, 2019; later transfers not counted ⚠).

Who we can ask (gatekeeper, by public role). The Glenn County Board of Supervisors, for what remains at Willows; the Siskiyou County Board of Supervisors, for the Weed mill as a public question; DGS, if the 1.7-acre state excess site is in play; and the federal landholding agencies (USDA 79 and Interior 34 idle assets on the card) for any federal lead. Each list has its own rules.

First small step. Put a public inventory on a county agenda: what still stands at Willows after the 2026 auction, and what still stands at Weed, before anyone talks about a reuse.

One positive action. We can ask the Glenn County Board of Supervisors to put “Willows straw plant: what remains, and what comes next” on a public agenda, so the people of the North State can see the door that is already built.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for North State — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilities — Willows straw-board plant; Roseburg Weed veneer millWillows: former CalPlant rice-straw MDF plant, 276 acres (North State draft, Nov 17, 2026, citing Lapis Advisers and the May 2026 auction record). Weed: mill size ⚠ not on file.Willows: equipment auction May 6–7, 2026, recorded as completed; what remains is ⚠ unknown. Weed veneer mill closed Dec 3, 2025, with about 140 jobs (same draft). No site chosen.What still stands at each site after closure or auction ⚠; power, rail, and environmental condition ⚠; not visited.
Idle government property already on this card170 local surplus parcels (158 vacant; about 3,515 acres, including Etna’s 3,099-acre row ⚠); 1 state excess site (1.7 acres); 113 federal idle assets; Sierra Army Depot 4,488 BRAC acres still to transfer (CRS R45705, Apr 25, 2019; later transfers not counted ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). A property on a list is a lead, not an offer.No specific parcel is selected; Surplus Land Act and agency rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 4000 Railroad Ave, Redding, CA 96001Two industrial buildings, combined 8,845 SF as listed (6,425 SF and 2,420 SF). Lot size ⚠ not stated on the page we opened. Asking price $725,000. Listed as industrial / manufacturing / warehouse.Active for sale on the listing page, checked Nov 19, 2026, PT. 4000 Railroad Ave listing (link returned HTTP 200 when checked Nov 19, 2026, PT)Zoning and power not checked ⚠; not visited; listings change.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Glenn County Board of Supervisors, and the Siskiyou County Board of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 2 · California Jobs First

Redwood

Research drafted

Counties: Del Norte, Humboldt, Lake, Mendocino (and Tribal lands).

Local materials: Timber and wood residue — timber was Humboldt’s top item in 2022 (234,000 MBF, $99.3 million). Vineyard and pear prunings in Mendocino and Lake (wine grapes: Lake 11,000 ac, Mendocino 16,500 ac, 2022). Clean recycled paper, cardboard and denim in every Redwood town; town tons ⚠. Del Norte’s crop report was not opened ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines for value-added wood fiber, then share them through a mill- and craft-town equipment hub.

Land restoration. We The People can ask officials to fix the problem. An example fire, not every fire in this region: the August Complex (2020), 1,032,648 acres across seven counties, 935 structures destroyed ⚠ (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 51 parcels (28 vacant) · 59 ac. State excess: 1 site · 7.7 ac. Federal idle: 81 assets (12 buildings) · 11,486 sq ft · Interior 74 (mostly structures). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the August Complex (2020), 1,032,648 acres across seven counties, 935 structures destroyed ⚠ (fire-damage draft, Nov 17, 2026, citing a mirrored CAL FIRE Jan 13, 2022 top-20 PDF). Public recovery cost and homes rebuilt are ⚠ not found yet.
  • Value-added wood and fiber processing, and a clear permit path for natural building materials — a need the Redwood plan itself already names (Redwood draft, Nov 17, 2026, citing the regional plan).
  • Training seats alongside processing: Lake County unemployment was 7.1% of a 26,900 labor force in September 2026, preliminary and not seasonally adjusted, the highest of the four Redwood counties in that draft (EDD, via the Redwood draft, Nov 17, 2026).
  • Put idle public property to a tested use: 51 local surplus parcels (28 vacant; 59 acres) and 81 federal idle assets, most of them Interior structures (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠.

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. A mill-town materials list and a small shared shop (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 28 vacant of 51, or a small already-built mill building, as a lead only, becomes a mill- and craft-town equipment hub for value-added wood fiber and fire-resistant natural building materials (straw, wood-fiber and fire-resistant hemp-lime among them; not hemp-only).

Who we can ask (gatekeeper, by public role). Humboldt County and the RISE Working Lands table, as public doors already named on this card; county planning and the local air district, for the permit map; and Interior, for any federal structure among the 81 idle assets, each under its own rules.

First small step. Publish a public list of local natural building materials and the code path for each, so makers know what they can build with — the Redwood plan’s own direction, written as something we can ask, not as an endorsement.

One positive action. We can ask Humboldt County and the RISE Working Lands table to put “a local natural building materials list and permit map” on a public agenda, so makers know what they can build with.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Redwood — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant or mill is already flagged on this card.Not found on this card ⚠. A generic “already-built mill building” was mentioned only as a type of lead, not as a chosen or identified site.Whether a specific closed mill in this region is available ⚠.
Idle government property already on this card51 local surplus parcels (28 vacant; 59 acres); 1 state excess site (7.7 acres); 81 federal idle assets. No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠.Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 2020 Industry Road, Ukiah, CA 95482Three buildings totaling approximately 14,160 SF on 1.01 acres, zoned I-1 as listed. Asking price $1,700,000.For sale on the listing page, checked Nov 19, 2026, PT. Two of the three buildings are currently leased, as the listing itself states ⚠. 2020 Industry Road listing (link returned HTTP 200 when checked Nov 19, 2026, PT)Power not checked ⚠; not visited; leased portions may not be free to use; listings change.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Humboldt County Board of Supervisors, and the Mendocino County Board of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 3 · California Jobs First

Capital

Research drafted

Counties: Colusa, El Dorado, Nevada, Placer, Sacramento, Sutter, Yolo, Yuba.

Local materials: Rice straw from the region’s rice counties (2022 harvested acres include Sutter 50,800, Yuba 37,200, Colusa 17,000, Placer 10,000, Yolo 8,480 and Sacramento 6,160; 2022 was a drought year ⚠). Nut hulls — for example Colusa almond hulls 55,400 t (2022). Sacramento’s urban paper, cardboard, denim and clean wood — the largest urban recycled stream among the Capital, Redwood and North State counties, as compiled in the Nov 17, 2026 northern draft; county tons by material ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines on this region's rice straw and Sacramento's urban paper and denim, then share them through a town equipment hub in the capital and the rice-belt towns.

Land restoration. We The People can ask officials to fix the problem. Example fires, not every fire in this region: Caldor (2021), 221,835 acres (El Dorado, Amador, Alpine; Amador and Alpine sit in the Sierra region), 1,003 structures ⚠ (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF, and Cal OES / CAL FIRE, Oct 9, 2025); and the North Complex (2020), 318,935 acres, 2,352 structures, 15 deaths (same draft, citing Cal OES / CAL FIRE, “Top 20 Most Destructive California Wildfires,” Oct 9, 2025). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 90 parcels (83 vacant) · 1,201 ac. State excess: 2 sites · 4.1 ac. Federal idle: 29 assets (29 buildings) · 33,616 sq ft · USDA 22, VA 6. BRAC still to transfer (CRS Apr 2019 table) ⚠: McClellan 457 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the example fires already on this card — Caldor (2021) 221,835 acres ⚠ (also burned Amador and Alpine in the Sierra region) and the North Complex (2020) 318,935 acres. Public recovery cost and homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026).
  • The making step: rice-straw drying and sizing in the rice-belt counties, and urban sorting of clean paper, cardboard and denim in Sacramento (statewide roll-up and Capital draft, Nov 17, 2026). County tons by material are ⚠ not compiled.
  • Work and training seats: Colusa County unemployment was 8.6% of an 11,780 labor force, Sutter 7.1% of 46,200, and Yuba 6.5% of 36,200 in September 2026, preliminary and not seasonally adjusted (EDD, via the Capital draft, Nov 17, 2026).
  • Put idle public property to a tested use: 90 local surplus parcels (83 vacant; 1,201 acres) and 29 idle federal buildings (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). McClellan’s 457 BRAC acres still to transfer are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. A capital-city recycled hub with rice-belt spokes (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 83 vacant of 90, or unused space among the 29 idle federal buildings (33,616 sq ft), as a lead only, becomes a shared equipment hub for clean paper, cardboard and denim in Sacramento, with rice-straw drying and sizing as spokes in the rice counties. Not hemp-only.

Who we can ask (gatekeeper, by public role). Each Capital Region Board of Supervisors; DGS, for the 2 state excess sites (4.1 acres); and USDA and VA as landholding agencies for the federal buildings on the card. Surplus Land Act rules apply to local parcels.

First small step. Publish one page of local tonnage for clean paper, cardboard, denim and clean wood, so every town can see what it already has.

One positive action. We can ask each Capital Region Board of Supervisors to publish one page of local tonnage for clean paper, cardboard, denim and clean wood, so that every town can see what it already has.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Capital — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card. McClellan’s 457 BRAC acres still to transfer are a government-list lead, not a named idle factory.Not found as a named idle plant on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card90 local surplus parcels (83 vacant; 1,201 acres); 2 state excess sites (4.1 acres); 29 idle federal buildings (33,616 sq ft); McClellan 457 BRAC acres still to transfer (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 3325–3327 Longview Dr, Sacramento, CA 9582129,834 SF industrial building, listed vacant. Asking price $4,750,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 3325–3327 Longview Dr listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask each Capital Region Board of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 4 · California Jobs First

Sierra

Research drafted

Counties: Alpine, Amador, Calaveras, Inyo, Mariposa, Mono, Tuolumne.

Local materials: Forest thinning and mill residue — 2024 timber harvests of 28,324 MBF in Calaveras and 14,256 MBF in Amador (CDTFA). Clay, pozzolan and pumice — Golden State Pozzolan, Ione (Amador) and Global Pumice, Olancha (Inyo) appear on Caltrans’s list. Off-grade alfalfa — 56,300 tons in Mono and 10,200 tons in Inyo (2024). The Sierra has no registered hemp acres (CDFA, as of Nov 4, 2026). Clean paper, cardboard and denim are in every town.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines for small-diameter wood and lime-pozzolan binders used in fire-resistant hemp-lime and plasters, then share them through a mountain-town equipment hub so small shops are not each buying every machine.

Land restoration. We The People can ask officials to fix the problem. An example fire, not every fire in this region: Rim (2013), 257,314 acres (Tuolumne) and 112 structures destroyed ⚠ (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 3 parcels (0 vacant) · 23 ac. State excess: 1 site · 41.3 ac. Federal idle: 98 assets (92 buildings) · 86,402 sq ft · Interior 78, USDA 20. No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the Rim Fire (2013), 257,314 acres in Tuolumne and 112 structures destroyed ⚠ (fire-damage draft, Nov 17, 2026, citing a mirrored CAL FIRE Jan 13, 2022 top-20 PDF). Public recovery cost and homes rebuilt are ⚠ not found yet.
  • A fiber-processing and small-diameter wood path: the Sierra draft’s top gap is that there is no fiber processing, and markets are small (Sierra draft and statewide roll-up, Nov 17, 2026).
  • Work in the smallest counties: Alpine County unemployment was 10.0% of a 420 labor force in September 2026, not seasonally adjusted (EDD Report 400C, via the Sierra draft, Nov 17, 2026; the PDF was read through a search snapshot ⚠).
  • Idle public property here is thin on the local list and larger on the federal list: only 3 local surplus parcels (0 vacant; 23 acres), 1 state excess site (41.3 acres), and 98 federal idle assets (92 buildings) (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. A mountain-town binder and wood-residue shop (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). Because the local surplus list has only 3 parcels, and none are vacant, this draft looks first at the 1 state excess site (41.3 acres) and the 98 idle federal assets (92 buildings, Interior 78 and USDA 20) as leads — a mountain-town equipment hub for small-diameter wood and lime-pozzolan binders used in fire-resistant hemp-lime and plasters. Not hemp-only. No site is chosen.

Who we can ask (gatekeeper, by public role). Sierra Jobs First, to name “local building materials” as a hub type in its Strategy 2 feasibility work (the region’s own plan language, as cited in the Sierra draft, Nov 17, 2026 — a public door, not an endorsement); DGS, for the state excess site; and Interior and USDA, for any federal lead, each under its own rules.

First small step. We can ask Sierra Jobs First, in public, to include a local building-materials hub type in that feasibility study, with wood residue, clay, pozzolan and recycled fiber as inputs to test.

One positive action. We can ask Sierra Jobs First to name “local building materials” as a hub type to study in its Strategy 2 feasibility work.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Sierra — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card.Not found on this card ⚠.Whether a specific closed mill or plant in this region is available ⚠.
Idle government property already on this card3 local surplus parcels (0 vacant; 23 acres); 1 state excess site (41.3 acres); 98 federal idle assets (92 buildings). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠.Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). Local vacant surplus is 0, so the state and federal lists are the public-property options already on the card.No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 20833 Mechanical Dr, Sonora, CA 95370MLS header lists 12,000 SF and 1.28 acres; the description also says approximately 12,000–13,500 SF ⚠. Asking price $1,100,000. Described as a versatile industrial/commercial property with warehouse space.Active, commercial sale, checked Nov 19, 2026, PT (MLS # EB41135713). 20833 Mechanical Dr listing (link returned HTTP 200 when checked Nov 19, 2026, PT)The two size figures on the same page are not the same ⚠; zoning and power not checked ⚠; not visited; listings change.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask Sierra Jobs First, as a public door, and DGS to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 5 · California Jobs First

Bay Area

Research drafted

Counties: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma.

Local materials: Clean recycled paper, cardboard and textiles — the nine counties landfilled 5,608,092 tons in 2024 (CalRecycle LG Central; county split is our assignment of jurisdiction rows ⚠). Alameda County’s 2023–24 study found about 102,500 tons of paper still landfilled and about 107,800 tons already collected in recycling carts (StopWaste, our sum of the study’s rounded tables ⚠). Vineyard prunings — Sonoma winegrapes $626,550,200 and Napa total ag $1,034,798,400 in 2024. Urban and C&D wood, plus registered hemp of 329.20 acres in five Bay counties (CDFA, as of Nov 4, 2026; registered, not harvested).

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice. The DAS public database already lists a Robotics Technician program, the Pleasanton USD Robotics Youth Apprenticeship (data current as of Nov 17, 2026) — an example on the books, not a partner.

Robot-Ready. We start with shop-floor machines on this region's clean recycled paper, cardboard and textiles, then share them through a town equipment hub.

Land restoration. We The People can ask officials to fix the problem. Example fires, not every fire in this region: LNU Lightning Complex (2020), 363,220 acres, 1,491 structures, 6 deaths; SCU Lightning Complex (2020), 396,624 acres, 222 structures ⚠ (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF); and the Tubbs Fire (2017), 36,807 acres, 5,636 structures, 22 deaths (same draft, citing Cal OES / CAL FIRE, “Top 20 Most Destructive California Wildfires,” Oct 9, 2025). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 546 parcels (292 vacant) · 2,623 ac. State excess: 2 sites · 4.4 ac. Federal idle: 261 assets (213 buildings) · 2,221,772 sq ft · Energy 95, VA 68, Interior 58. BRAC still to transfer (CRS Apr 2019 table) ⚠: Concord NWS 4,972; Hunters Point 846; Mare Island 415; Alameda 256; Treasure Island 161; Oakland Army Base 18. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land and rebuild after the example fires already on this card — LNU (2020), SCU (2020) ⚠, and Tubbs (2017), which destroyed 5,636 structures. Public recovery cost and homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026).
  • The making step for a large recycled stream: the nine counties landfilled 5,608,092 tons in 2024, and the roll-up’s top gap for this region is industrial land cost and no confirmed paper or denim processing line ⚠ (Bay Area draft and statewide roll-up, Nov 17, 2026).
  • A shared-equipment path so small shops can make, not only sort. Unemployment in September 2026, not seasonally adjusted, ranged from San Mateo 3.9% to Solano 5.3% (EDD, via the Bay Area draft, Nov 17, 2026); the documented gap here is the making step, not a claim about a regional unemployment crisis.
  • Put idle public property to a tested use: 546 local surplus parcels (292 vacant; 2,623 acres) and 261 federal idle assets totaling 2,221,772 sq ft (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). BRAC acres still to transfer in the CRS Apr 2019 table ⚠ (Concord NWS 4,972, Hunters Point 846, and others on the card) are leads, not offers.

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Shared recycled-materials shops in every Bay town (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 292 vacant of 546, or unused space among the 261 idle federal assets, as a lead only, becomes a town equipment hub for clean recycled paper, cardboard and textiles — a share-equipment hub, and an urban farm only where a specific parcel and its rules allow it (a goal). Not hemp-only. Registered hemp in five Bay counties is 329.20 acres as of Nov 4, 2026; registered is not harvested.

Who we can ask (gatekeeper, by public role). The Bay Area Jobs First Collaborative, as a public door; county surplus-land officers, under the Surplus Land Act; DGS, for the 2 state excess sites (4.4 acres); and Energy, VA and Interior as landholding agencies for federal leads.

First small step. Put “recycled-materials making step and shared equipment hubs” on a public steering-committee agenda.

One positive action. We can ask the Bay Area Jobs First Collaborative to put “recycled-materials making step and shared equipment hubs” on a public steering-committee agenda.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Bay Area — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card.Not found on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card546 local surplus parcels (292 vacant; 2,623 acres); 2 state excess sites (4.4 acres); 261 federal idle assets totaling 2,221,772 sq ft; BRAC acres still to transfer in the CRS Apr 2019 table ⚠ (Concord NWS 4,972, Hunters Point 846, and others on the card).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 5309–5321 E 8th St, Oakland, CA 9460116,700 SF industrial building. Asking price $2,100,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 5309–5321 E 8th St listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Bay Area Jobs First Collaborative, as a public door, and county surplus-land officers to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 6 · California Jobs First

Northern San Joaquin

Research drafted

Counties: Merced, San Joaquin, Stanislaus.

Local materials: Almond hulls and shells — Merced and San Joaquin together produced 522,484 tons of almond hulls and 159,294 tons of shells (2024 crop reports). Orchard prunings — Merced sold 28,106 cords of orchard prunings and removals as firewood (2024). Hydrated lime — Lhoist Stockton is a listed California hydrated-lime plant. Clean paper, cardboard and textiles in Stockton, Modesto and Merced; local tons ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines on this region's hulls, shells and hydrated-lime binders, then share them through a town equipment hub so many small shops can use them.

Land restoration. We The People can ask officials to fix the problem. The SCU Complex (2020) reached Stanislaus and San Joaquin Counties; acres by county are ⚠ not found yet (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF ⚠). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 135 parcels (47 vacant) · 1,332 ac. State excess: 3 sites · 860.7 ac. Federal idle: 20 assets (20 buildings) · 81,464 sq ft · Energy 15. BRAC still to transfer (CRS Apr 2019 table) ⚠: Riverbank AAP 172 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • The SCU Complex (2020) reached Stanislaus and San Joaquin Counties; acres by county are ⚠ not found yet, and public recovery cost and homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026). Restoration need is documented as a question, not as an acre figure.
  • A building-materials branch inside the region’s own Circular Bioeconomy priority: the Northern San Joaquin plan names Advanced Manufacturing, Clean Energy, Carbon Management and the Circular Bioeconomy as priority sectors (Northern San Joaquin draft, Nov 17, 2026, citing the regional plan). KOEB is not part of the region’s Jobs First awards.
  • Processing hulls and shells to a building-materials specification, and a clear permit path (Valley Air’s 180-day clock is already on the record in that draft). There is no California quicklime source on the Caltrans list used in the draft; Lhoist Stockton is a listed hydrated-lime plant.
  • Work and training: Merced County unemployment was 8.1%, San Joaquin 6.2%, and Stanislaus 6.6% in September 2026, not seasonally adjusted (EDD Report 400C, via the Northern San Joaquin draft, Nov 17, 2026; the PDF was read through a search snapshot ⚠).
  • Put idle public property to a tested use: 135 local surplus parcels (47 vacant; 1,332 acres) and 3 state excess sites totaling 860.7 acres (HCD Table H 2025; DGS last edited Oct 29, 2026, our grouping ⚠). Riverbank AAP’s 172 BRAC acres are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. A bioeconomy materials branch, town by town (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 47 vacant of 135, or one of the 3 state excess sites (860.7 acres total), as a lead only, becomes a small residue-to-building-materials shop and shared equipment hub for hulls, shells and hydrated-lime binders. Not hemp-only. Riverbank AAP’s 172 acres remain a lead only.

Who we can ask (gatekeeper, by public role). North Valley THRIVE, as a public door already named on this card (not an endorser); the Merced, San Joaquin and Stanislaus Boards of Supervisors; DGS and HCD, for any state excess site (housing rules still apply where the list requires them); and Valley Air, for the permit path.

First small step. We can ask North Valley THRIVE’s public meetings to hear a short “every town is a materials node” briefing, so small makers can join the bioeconomy table.

One positive action. We can ask North Valley THRIVE’s public meetings to hear a 5-minute “every town is a materials node” briefing, so small makers can join the bioeconomy table.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Northern San Joaquin — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesLhoist Stockton is a listed hydrated-lime plant already named on this card. It is not treated here as an idle plant; current operating status was not re-checked in this pass ⚠.Not used as an idle-plant option, because this card does not flag it as closed.Operating status ⚠; not a confirmed idle facility.
Idle government property already on this card135 local surplus parcels (47 vacant; 1,332 acres); 3 state excess sites (860.7 acres); 20 idle federal buildings; Riverbank AAP 172 BRAC acres (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; housing rules may still apply on some state sites; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 802 S American St, Stockton, CA 9520611,000 SF industrial building. Asking price $1,100,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 802 S American St listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Merced, San Joaquin and Stanislaus Boards of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 7 · California Jobs First · the model

Central San Joaquin

Due diligence Fresno / Mendota only

Counties: Fresno, Kings, Madera, Tulare. The Mendota hub is in due diligence only, with no build dates.

Local materials: Almond hulls and other farm fiber — Fresno almond hulls 574,000 t and Madera 314,874 t (2024). Cotton stalks, straw, vine prunings and dairy fiber at scale in the region. Clean paper, cardboard and denim in every town; local tons ⚠. Registered hemp acres (CDFA, as of Nov 4, 2026; registered, not harvested): Fresno 2,212.07, Tulare 393.03, Kings 160.00, Madera 40.00; the region holds about 58% of California’s 4,808.61 acres ⚠ (our arithmetic). Hemp is one source among many; we are not hemp-only.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines on this region's almond hulls, hemp fiber, cotton stalks, and clean paper and denim — Fresno is the prototype shop — then share them through a town equipment hub so many small shops can use them.

Land restoration. We The People can ask officials to fix the problem. An example fire, not every fire in this region: Creek (2020), 379,895 acres (Fresno, Madera) and 853 structures destroyed ⚠ (from the Nov 17, 2026 fire-damage draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 73 parcels (44 vacant) · 229 ac. State excess: 0 open (Fresno and Reedley state sites already awarded for housing). Federal idle: 82 assets (82 buildings) · 86,242 sq ft · USDA 58, Interior 22 (Sierra NF, Sequoia–Kings Canyon). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠. No site has been chosen; the Mendota hub is in due diligence only. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the Creek Fire (2020), 379,895 acres in Fresno and Madera and 853 structures destroyed ⚠ (fire-damage draft, Nov 17, 2026, citing a mirrored CAL FIRE Jan 13, 2022 top-20 PDF). Public recovery cost and homes rebuilt are ⚠ not found yet.
  • The making step: no confirmed commercial decortication, drying or sizing line running in California (our review, not a full survey; statewide roll-up and Central San Joaquin draft, Nov 17, 2026 ⚠), plus a clear permit path.
  • Work and training seats: Tulare County unemployment was 9.8%, Kings 8.1%, Fresno 7.4%, and Madera 7.0% in September 2026, not seasonally adjusted (EDD Report 400C, via the Central San Joaquin draft, Nov 17, 2026; the PDF was read through a search snapshot ⚠).
  • Healthy, fire-resistant homes from local materials are a goal, not a promise. Regional RHNA allocations were ⚠ not compiled in these drafts. State excess sites in this region are already awarded for housing (0 open).
  • Put idle public property to a tested use: 73 local surplus parcels (44 vacant; 229 acres) and 82 federal idle buildings (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). The Mendota hub is in due diligence only, with no build dates. No site has been chosen.

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Field-to-product shops beside the Mendota diligence (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 44 vacant of 73, as a lead only, becomes a prototype shop-floor for almond hulls, cotton stalks, clean paper and denim, and hemp fiber among other fibers — not hemp-only — with an apprentice training yard (a goal). The Mendota hub stays in due diligence only, with no build dates. The 82 idle federal buildings (USDA 58, Interior 22) are leads, not offers.

Who we can ask (gatekeeper, by public role). The Fresno County Board of Supervisors; Valley Air, for a one-page permit path; Surplus Land Act officers, for any local parcel; and USDA or Interior, only if a federal lead is later tested under that list’s rules.

First small step. Put “field-to-product processing: permit map and local recycled tonnage” on a public Board agenda.

One positive action. We can ask the Fresno County Board of Supervisors to put “field-to-product processing: permit map and local recycled tonnage” on a public agenda.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. The Mendota plant remains in due diligence only, with no build dates; it is one option among these, not a favorite. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Central San Joaquin — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plant / facility — Mendota plant (former Covanta biomass site)Address in the Oct 31, 2026 kickstart draft: 400 Guillan Park Dr (other public pages spell the street Guillen Parkway ⚠). Listing claims already on file: ±70.99 acres, M-2 Heavy Manufacturing, a 25 MW substation and a CAISO interconnection agreement, built to take orchard wood (broker listing, read Oct 24, 2026, via the Project Plan ⚠).Due diligence only, with no build dates. Not chosen and not contacted. The listing URL was not re-found in this pass ⚠.Listing claims not independently surveyed ⚠; FEMA Zone A on parts, a mapped emergent wetland, and environmental reports unread ⚠; current listing availability ⚠; power and interconnection status today ⚠.
Idle government property already on this card73 local surplus parcels (44 vacant; 229 acres); 0 state excess sites open (Fresno and Reedley state sites already awarded for housing); 82 federal idle buildings (86,242 sq ft; USDA 58, Interior 22). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠.Leads on public lists only (HCD Table H 2025; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 3488 W Ashlan Ave, Fresno, CA 9372239,695 SF manufacturing building on 8.90 acres, zoning IL Light Industrial as listed, listed vacant. Asking price $6,250,000. Near Highway 99, as the listing card states.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 3488 W Ashlan Ave listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Power not independently checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Fresno County Board of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 8 · California Jobs First

Central Coast

Research drafted

Counties: Monterey, San Benito, San Luis Obispo, Santa Barbara, Santa Cruz, Ventura.

Local materials: Vineyard and produce prunings — including SLO wine grapes $194,981,000, Monterey $152M, and Santa Barbara $70,857,000 ⚠ (2024); Ventura avocado 19,282 acres and lemon 16,067 acres. Vegetable and berry residues (tons of residue per crop are not measured ⚠). Clean recycled paper, cardboard and fiber in all six counties. Registered hemp: 364.23 acres (Monterey 218.02, Ventura 145.87, Santa Cruz 0.34; CDFA, as of Nov 4, 2026). Lime-kiln capacity in the region: USGS listed Natividad, Salinas, in its 2019 directory; current status ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines that turn this region's vineyard and produce prunings, hemp and clean recycled fiber into feedstock, then share them through a farm-town equipment hub.

Land restoration. We The People can ask officials to fix the problem. Example fires, not every fire in this region: CZU Lightning Complex (2020), 86,509 acres, 1,490 structures (from the Nov 17, 2026 fire-damage draft, citing the CAL FIRE CZU incident page, last updated Oct 21, 2022); Thomas (2017), 281,893 acres, 1,063 structures ⚠ (same draft, citing CAL FIRE’s Jan 13, 2022 top-20 list, read from a mirrored PDF); and Woolsey (2018), 96,949 acres, 1,643 structures (same draft, citing Cal OES / CAL FIRE, Oct 9, 2025). This region also has the Moss Landing battery-plant fires of Jan 16, 2025 and Sept 18, 2026; damaged acreage there is ⚠ not found yet. Public recovery cost and homes rebuilt for the wildfires: ⚠ not found yet.

Idle public property. Local surplus: 130 parcels (37 vacant) · 772 ac. State excess: 3 sites · 39.9 ac. Federal idle: 55 assets (30 buildings) · 78,594 sq ft · NASA 24 (Santa Susana), USDA 17. BRAC still to transfer (CRS Apr 2019 table) ⚠: Fort Ord 7,778 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the example fires already on this card — CZU (2020) 86,509 acres, Thomas (2017) 281,893 acres ⚠, and Woolsey (2018) 96,949 acres — and after the Moss Landing battery-plant fires of Jan 16, 2025 and Sept 18, 2026, where damaged acreage is ⚠ not found yet. Public recovery cost and homes rebuilt for the wildfires are ⚠ not found yet (fire-damage and Moss Landing drafts, Nov 17, 2026). Clean land comes first.
  • The making step for vineyard and produce prunings and clean recycled fiber, and a current status check on lime-kiln capacity (USGS listed Natividad, Salinas, in 2019; current status ⚠) (Central Coast draft, Nov 17, 2026).
  • Work: San Benito County unemployment was 5.7% in September 2026, not seasonally adjusted, the highest of the six Central Coast counties in that draft; Monterey was 5.5% (EDD, via the Central Coast draft, Nov 17, 2026).
  • Put idle public property to a tested use: 130 local surplus parcels (37 vacant; 772 acres) and 3 state excess sites (39.9 acres) (HCD Table H 2025; DGS last edited Oct 29, 2026, our grouping ⚠). Fort Ord’s 7,778 BRAC acres still to transfer are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Residues and a clean-land shop on the Central Coast (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 37 vacant of 130, or one of the 3 state excess sites (39.9 acres), as a lead only, becomes a farm-town equipment hub for vineyard and produce prunings and clean recycled fiber. A restoration nursery for fire-area or Moss Landing work is a goal only where soil tests allow; plants grown to pull metals out of soil are tested waste and never go into homes, food, feed or compost (restoration plan rule). Fort Ord remains a lead only.

Who we can ask (gatekeeper, by public role). Uplift Central Coast, as a public door; the six county boards; DGS, for state excess sites; and the agencies that still hold Fort Ord transfer land, only as a lead under that list’s rules. Moss Landing restoration stays in its own draft.

First small step. Put “residues and recycled materials into local products” on Uplift Central Coast’s next public agenda.

One positive action. We can ask Uplift Central Coast to put “residues and recycled materials into local products” on its next public agenda.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Central Coast — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing facility already flagged — Natividad, SalinasUSGS listed Natividad, Salinas, in its 2019 lime-plant directory (dolomitic lime; rotary kiln). Size and acreage ⚠ not compiled on this card.Current status ⚠ unknown (already flagged on this card and in the Nov 17, 2026 kiln-bottleneck draft). This is not a confirmed idle plant.Whether the facility still operates, is idle, or is available ⚠; condition, zoning for a change of use, and power ⚠; not visited.
Idle government property already on this card130 local surplus parcels (37 vacant; 772 acres); 3 state excess sites (39.9 acres); 55 federal idle assets; Fort Ord 7,778 BRAC acres still to transfer (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 45 N Main St, Salinas, CA 9390130,610 SF industrial building. Asking price $3,495,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 45 N Main St listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; occupancy not confirmed on the card we could not fully open ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask Uplift Central Coast, as a public door, and the six county boards to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 9 · California Jobs First

Kern County

Research drafted

Counties: Kern.

Local materials: Farm fiber, hulls, straw and manure solids — Kern sold 647,000 tons of dairy manure (2024); 2024 crop value $7,960,900,835. Cementitious and pozzolan binders on Caltrans’s list: CalPortland Mojave, Tehachapi Cement, and National Cement in Lebec, with CalPortland Mojave also listed for natural pozzolan. Registered hemp: 415.69 acres (CDFA, Nov 4, 2026). Orchard and vine residue tons ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines that test farm fiber in this region's cementitious and pozzolan blends, including heat and dust on the shop floor, then share those machines through a town equipment hub.

Land restoration. We The People can ask officials to fix the problem. No documented land-damage item yet ⚠: the Nov 17, 2026 fire-damage draft found no Kern fire on CAL FIRE’s or Cal OES’s top-20 lists.

Idle public property. Local surplus: 266 parcels (168 vacant) · 3,300 ac. State excess: 1 site · 0.3 ac. Federal idle: 3 assets (3 buildings) · 3,232 sq ft. No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • No documented land-damage item yet ⚠: the Nov 17, 2026 fire-damage draft found no Kern fire on CAL FIRE’s or Cal OES’s top-20 lists. That is not a finding of zero need; it is a gap in this desk record.
  • Fiber processing next to binders this region already has on Caltrans lists (CalPortland Mojave, Tehachapi Cement, National Cement in Lebec). There is no California quicklime source on that list (Kern draft and statewide roll-up, Nov 17, 2026).
  • Work and training: Kern County unemployment was 7.9% in September 2026, not seasonally adjusted (EDD Report 400C, via the Kern draft, Nov 17, 2026; the PDF was read through a search snapshot ⚠).
  • Put idle public property to a tested use: 266 local surplus parcels (168 vacant; 3,300 acres) — a large local list. The 1 state excess site is only 0.3 acres, and federal idle assets are 3 buildings totaling 3,232 sq ft (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Farm fiber tested in Kern’s own binders (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 168 vacant of 266 (about 3,300 acres on the local surplus list), as a lead only, becomes a shop-floor that tests farm fiber in this region’s cementitious and pozzolan blends, and a shared equipment hub for small makers. Not hemp-only. Registered hemp is 415.69 acres as of Nov 4, 2026; registered is not harvested. The very small state and federal counts on this card are leads too, not offers.

Who we can ask (gatekeeper, by public role). The Kern Coalition, as a public door already named on this card; the Kern County Board of Supervisors; Surplus Land Act officers, for local parcels; and the local air district, for a clear permit path.

First small step. Add “field-to-product processing for small makers” to the Kern Coalition’s next public implementation discussion.

One positive action. We can ask the Kern Coalition to add “field-to-product processing for small makers” to its next public implementation discussion.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Kern County — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card.Not found on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card266 local surplus parcels (168 vacant; about 3,300 acres); 1 state excess site (0.3 acres); 3 federal idle buildings (3,232 sq ft). No BRAC acres are listed for this region in the CRS Apr 2019 table ⚠.Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 4600 District Blvd, Bakersfield, CA 933134,200 SF industrial building. Asking price $825,000. This is a small building; it is an example listing, not a size match for a full hub ⚠.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 4600 District Blvd listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Kern County Board of Supervisors, and the Kern Coalition, as a public door to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 10 · California Jobs First

Los Angeles County

Research drafted

Counties: Los Angeles.

Local materials: Textiles and denim — the City of LA’s recycLA franchise reported an average of 71,898 tons a year of textiles in commercial black bins in 2019–2021; fiber audits found over 52% cotton or cotton-rich (California Product Stewardship Council, Mar 18, 2026). Paper, cardboard and port/rail pallets; LA share of statewide lumber tons ⚠. Nursery waste; the county’s newest posted crop report is 2019 ⚠. No registered hemp in LA County (not listed, CDFA as of Nov 4, 2026). County-level tons by material ⚠.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice. Seats for former apparel and textile workers who want them are a goal; no numbers are promised.

Robot-Ready. We start with shop-floor machines that turn this region's textile and paper scraps into fiber, insulation and yarn, then share them among small garment and making shops through a town equipment hub.

Land restoration. We The People can ask officials to fix the problem. The Eaton and Palisades fires began Jan 7, 2025, and were contained Jan 31, 2025: Eaton 14,021 acres; Palisades 23,448 acres (from the Nov 17, 2026 fire-damage draft, citing the CAL FIRE Eaton Fire incident page, last updated Aug 6, 2026, and the LA County anniversary fact sheet, date ⚠). Structures destroyed: Eaton 9,419 (CAL FIRE) / 9,414 (County); Palisades 6,837 (County). Lives lost: Eaton 19; Palisades 12. Homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 319 parcels (187 vacant) · 574 ac. State excess: 4 sites · 3.6 ac. Federal idle: 82 assets (78 buildings) · 1,340,265 sq ft · VA 37 (Long Beach, West LA), NASA 23. BRAC still to transfer (CRS Apr 2019 table) ⚠: Long Beach NS 56 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Rebuild after the Eaton and Palisades fires (contained Jan 31, 2025): Eaton 14,021 acres and Palisades 23,448 acres; structures destroyed include Eaton 9,419 (CAL FIRE) / 9,414 (County) and Palisades 6,837 (County); lives lost, Eaton 19 and Palisades 12. Homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026). Regional RHNA allocations were ⚠ not compiled in these drafts; the documented need here is the rebuild itself.
  • A making step for textile and paper scraps, and a permit path for small shops. The LA County Jobs First report lists apparel at 24,192 jobs (2022), down 28.3% in 5 years and 49.8% in 10 years, and textile manufacturing at 6,318 jobs, down 29.5% in 10 years (Los Angeles draft, Nov 17, 2026, citing the regional report). Seats for former apparel and textile workers who want them are a goal; no numbers are promised.
  • Unemployment in Los Angeles County was 4.5% in September 2026, not seasonally adjusted (EDD LAUS via FRED, via the Los Angeles draft, Nov 17, 2026). The documented gap is the making step and the rebuild, not a claim that unemployment is the highest need.
  • Put idle public property to a tested use: 319 local surplus parcels (187 vacant; 574 acres), 4 state excess sites (3.6 acres), and 82 federal idle assets totaling 1,340,265 sq ft, including VA and NASA buildings as leads (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠). Long Beach NS 56 BRAC acres are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Neighborhood textile-and-paper shops, and a path to fire-resistant homes (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 187 vacant of 319, or unused space among the 82 idle federal assets, as a lead only, becomes a shared shop that turns textile and paper scraps into fiber, insulation and yarn, and — as a goal — fire-resistant materials for rebuilding. Not hemp-only. No registered hemp is listed in LA County (CDFA, as of Nov 4, 2026).

Who we can ask (gatekeeper, by public role). The Los Angeles County Board of Supervisors; the LA County Jobs First Collaborative, as a public door (its report already names a circular-economy path for organic waste and textiles — a citation, not an endorsement); DGS, for the 4 state excess sites; Surplus Land Act officers, for local parcels; and VA, NASA or GSA, for any federal lead under that list’s rules.

First small step. Put “textile and paper tons by city” on a public Board agenda, so every neighborhood can see what it throws away and what it could build.

One positive action. We can ask the LA County Board of Supervisors to put “textile and paper tons by city” on a public agenda, so every neighborhood can see what it throws away and what it could build.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Los Angeles County — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card.Not found on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card319 local surplus parcels (187 vacant; 574 acres); 4 state excess sites (3.6 acres); 82 federal idle assets totaling 1,340,265 sq ft; Long Beach NS 56 BRAC acres (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 4000 S Broadway, Los Angeles, CA 9003712,497 SF industrial building. Asking price $2,250,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 4000 S Broadway listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Los Angeles County Board of Supervisors to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 11 · California Jobs First

Inland SoCal

Research drafted

Counties: Riverside, San Bernardino.

Local materials: Desert hay and dates — Riverside alfalfa 293,360 tons and dates 40,400 tons (2024). Cement and natural pozzolans on Caltrans lists (including plants in Victorville, Lucerne Valley, Corona and Adelanto, as compiled in the Nov 17, 2026 regional draft). Paper, cardboard, textiles and pallets — San Bernardino County disposed 2.34 million tons of solid waste in 2024; by-material split ⚠; Riverside total ⚠. Registered hemp: Riverside 206.56 acres; San Bernardino not listed (CDFA, as of Nov 4, 2026).

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice. Chaffey College InTech describes a Mechatronics Technician apprenticeship (college page opened Nov 17, 2026; the DAS program record was ⚠ not opened this pass) — a possible fit only, not a partner.

Robot-Ready. We start with shop-floor machines on this region's desert fiber and pozzolan binders, then share them through a town equipment hub — including in warehouse-district workshops, as a goal.

Land restoration. We The People can ask officials to fix the problem. An example fire, not every fire in this region: the Old Fire (2003) in San Bernardino County, 91,281 acres, 1,003 structures destroyed, 6 deaths (from the Nov 17, 2026 fire-damage draft, citing Cal OES / CAL FIRE, “Top 20 Most Destructive California Wildfires,” Oct 9, 2025). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 854 parcels (555 vacant) · 3,044 ac. State excess: 2 sites · 197.3 ac. Federal idle: 16 assets (14 buildings) · 18,864 sq ft. BRAC still to transfer (CRS Apr 2019 table) ⚠: George AFB 866 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the Old Fire (2003) in San Bernardino County, 91,281 acres, 1,003 structures destroyed, 6 deaths (fire-damage draft, Nov 17, 2026, citing Cal OES / CAL FIRE, Oct 9, 2025). Public recovery cost and homes rebuilt are ⚠ not found yet.
  • A drying and making line, and a fire-code path for fiber storage ⚠ (Inland SoCal draft and statewide roll-up, Nov 17, 2026).
  • Work: Riverside County unemployment was 5.9% and San Bernardino 5.5% in September 2026, not seasonally adjusted (EDD LAUS via FRED, via the Inland SoCal draft, Nov 17, 2026). IE Core industrial vacancy was 7.2% in Q3 2026, with 12.5 million sq ft offered for sublease (CBRE, as cited in that draft) — short-term space is an asset to study; lease costs remain ⚠.
  • This region has the largest local surplus list of the 13: 854 parcels (555 vacant; 3,044 acres), plus 2 state excess sites (197.3 acres) (HCD Table H 2025; DGS last edited Oct 29, 2026, our grouping ⚠). George AFB’s 866 BRAC acres are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Warehouse-district workshops on idle public land (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 555 vacant of 854, as a lead only, becomes a warehouse-to-workshop and shared equipment hub for desert fiber and pozzolan binders, and for fire-resistant building materials (a goal). Fire-code limits on fiber storage are a first check ⚠. The 2 state excess sites (197.3 acres) and George AFB’s 866 acres remain leads, not offers.

Who we can ask (gatekeeper, by public role). Thrive Inland SoCal, as a public door already named on this card; the Riverside and San Bernardino County Boards of Supervisors; Surplus Land Act officers; DGS, for state excess sites; and the local fire-code officials, before any fiber is stored.

First small step. List one warehouse-to-workshop pilot in Thrive Inland SoCal’s next activation plan, so main-street makers can test green building materials here.

One positive action. We can ask Thrive Inland SoCal to list one warehouse-to-workshop pilot in its next activation plan, so main-street makers can test green building materials here.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Inland SoCal — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesCement and natural pozzolan plants in Victorville, Lucerne Valley, Corona and Adelanto are named on this card as Caltrans-list geography, not as idle facilities. They are not treated here as idle-plant options.No named idle plant is already flagged on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card854 local surplus parcels (555 vacant; 3,044 acres); 2 state excess sites (197.3 acres); 16 federal idle assets; George AFB 866 BRAC acres (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 6170 Quail Valley Ct, Riverside, CA 925077,080 SF industrial building with a large yard, as the listing card states. Asking price $1,895,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 6170 Quail Valley Ct listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Riverside and San Bernardino County Boards of Supervisors, and Thrive Inland SoCal, as a public door to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 12 · California Jobs First

Orange County

Research drafted

Counties: Orange.

Local materials: Clean recycled paper, cardboard and textiles. Nursery and green waste — nursery stock is the leading commodity at over 51% of Orange County’s $73,589,000 agricultural value in 2024. Clean wood, pallets and food waste. Local tons by material ⚠. No registered hemp (CDFA, as of Nov 4, 2026). This region has the smallest grown base of the 13.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines for recycled-fiber filament and precision feedstock, then share them through a town equipment hub so this region's small makers can use them.

Land restoration. We The People can ask officials to fix the problem. No documented land-damage item yet ⚠: the Nov 17, 2026 fire-damage draft found no Orange County fire on CAL FIRE’s or Cal OES’s top-20 lists.

Idle public property. Local surplus: 261 parcels (194 vacant) · 1,066 ac. State excess: 1 site · 79.0 ac. Federal idle: 0. BRAC still to transfer (CRS Apr 2019 table) ⚠: El Toro 292; Tustin 233. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • No documented land-damage item yet ⚠: the Nov 17, 2026 fire-damage draft found no Orange County fire on CAL FIRE’s or Cal OES’s top-20 lists. That is not a finding of zero need.
  • A making space for circular materials: this region has the smallest grown base of the 13, no registered hemp listed (CDFA, as of Nov 4, 2026), and county tons by material ⚠ (Orange County draft, Nov 17, 2026). The county’s own Jobs First plan already says, in its words, to “Adopt circular economy principles” and to “Develop and produce materials and products for climate adaptation (e.g., heat-resistant building materials).” We quote that as the plan’s language. Our own materials on this page are described as fire-resistant.
  • Unemployment in Orange County was 4.3% in September 2026, not seasonally adjusted (EDD LAUS via FRED, via the Orange County draft, Nov 17, 2026). The documented gap is feedstock and a mapped processing space, not a claim about a regional unemployment crisis.
  • Put idle public property to a tested use: 261 local surplus parcels (194 vacant; 1,066 acres) and 1 state excess site (79.0 acres). Federal idle assets on the card are 0. El Toro 292 and Tustin 233 BRAC acres still to transfer are leads, not offers (HCD Table H 2025; DGS last edited Oct 29, 2026; CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Circular materials for small Orange County shops (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). A vacant local surplus parcel among the 194 vacant of 261, or the 1 state excess site (79.0 acres), as a lead only, becomes a shared equipment hub for recycled-fiber feedstock and precision making — a maker spoke, with an urban farm only where a specific parcel and its rules allow it (a goal). Not hemp-only. El Toro and Tustin remain leads only.

Who we can ask (gatekeeper, by public role). The Orange County Jobs First Collaborative, as a public door, using its own plan’s words as the agenda; the Orange County Board of Supervisors; Surplus Land Act officers; and DGS, for the state excess site.

First small step. Host one public session on “circular materials for small shops,” using the plan’s own words as the agenda.

One positive action. We can ask the Orange County Jobs First Collaborative to host one public session on “circular materials for small shops,” using its own plan’s words as the agenda.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Orange County — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plants / facilitiesNo named idle plant is already flagged on this card.Not found on this card ⚠.Whether a specific closed plant in this region is available ⚠.
Idle government property already on this card261 local surplus parcels (194 vacant; 1,066 acres); 1 state excess site (79.0 acres); 0 federal idle assets on the card. El Toro 292 and Tustin 233 BRAC acres still to transfer are leads, not offers (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; CRS, Apr 25, 2019 ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 1428 W South Central Park Ave, Anaheim, CA 9280210,360 SF industrial building, listed vacant, 0.59 acres as the listing card states. Asking price $3,522,400.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 1428 W South Central Park Ave listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Orange County Board of Supervisors, and the Orange County Jobs First Collaborative, as a public door to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Region 13 · California Jobs First

Southern Border

Research drafted

Counties: Imperial, San Diego.

Local materials: Baled straw and hay — Imperial 2024: baled straw 123,911 tons; alfalfa 1,368,003 tons. San Diego nursery and green waste — 2024 agriculture $1.67 billion, with the top three nursery lines totaling just over $1.08 billion; avocado and citrus prunings ⚠. Clean paper, cardboard and denim in every town; local tons ⚠. Redeeming the Brawley (Spreckels) site is a goal; kiln status is unknown ⚠. No site is chosen here.

Apprenticeship path: Federal OA registration and state DAS approval are both open; a program can hold both. ⚠ Whether the state's needs test still applies is unverified. Not legal advice.

Robot-Ready. We start with shop-floor machines on this region's straw and other farm residues, then share them through a town equipment hub across Imperial and San Diego.

Land restoration. We The People can ask officials to fix the problem. Example fires, not every fire in this region: Cedar (2003), 273,246 acres, 2,820 structures, 15 deaths; and Witch (2007), 197,990 acres, 1,650 structures (from the Nov 17, 2026 fire-damage draft, citing Cal OES / CAL FIRE, “Top 20 Most Destructive California Wildfires,” Oct 9, 2025). Public recovery cost and homes rebuilt: ⚠ not found yet.

Idle public property. Local surplus: 144 parcels (113 vacant) · 477 ac. State excess: 2 sites · 419.7 ac. Federal idle: 7 assets (6 buildings) · 6,583 sq ft. BRAC still to transfer (CRS Apr 2019 table) ⚠: San Diego NTC 51 acres. A property on a list is a lead, not an offer.

Priority needs

Needs below are drawn from dated public sources already used on this page and in the Nov 17, 2026 regional drafts. They are not a complete needs list, and they are not a ranking. Regional RHNA housing allocations were ⚠ not compiled in these drafts.

  • Restore land after the example fires already on this card — Cedar (2003) 273,246 acres and Witch (2007) 197,990 acres. Public recovery cost and homes rebuilt are ⚠ not found yet (fire-damage draft, Nov 17, 2026).
  • Work: Imperial County unemployment was 20.8% in September 2026, not seasonally adjusted, the highest of California’s 58 counties; San Diego County was 4.7% (EDD / BLS via FRED, via the Southern Border draft and the statewide roll-up, Nov 17, 2026).
  • A processing step and a current kiln status at the Brawley (Spreckels) site, which is a goal to study; kiln status is ⚠ unknown, and no site is chosen (Southern Border draft, Nov 17, 2026). The region’s own plan, Strategy 5, already calls for circular-economy materials recovery (cited in that draft, p. 160) — a citation, not an endorsement.
  • Put idle public property to a tested use: 144 local surplus parcels (113 vacant; 477 acres) and 2 state excess sites totaling 419.7 acres (HCD Table H 2025; DGS last edited Oct 29, 2026, our grouping ⚠). San Diego NTC’s 51 BRAC acres are a lead, not an offer (CRS, Apr 25, 2019 ⚠).

Draft proposal for idle public properties

Draft only. This is a desk proposal, not a plan anyone has approved. No site is chosen. A property on a list is a lead, not an offer. No board, collaborative, college or owner named here has endorsed KOEB. We The People can ask officials to fix the problem. Nothing here is a money ask.

Title. Redeem a making node, Imperial to San Diego (a draft proposal, not an approved plan)

What the empty asset becomes (a goal). Redeeming the Brawley site remains a goal to study (kiln status ⚠ unknown; no site chosen). Alongside that question, a vacant local surplus parcel among the 113 vacant of 144, or one of the 2 state excess sites (419.7 acres), as a lead only, becomes a multi-material shop for baled straw and clean recycled fiber, with an apprentice training yard and a call-back path for former plant workers who want it (a goal; no numbers promised). Not hemp-only.

Who we can ask (gatekeeper, by public role). The Imperial County Board of Supervisors; the Southern Border Coalition, as a public door, under its Strategy 5 circular-economy language; San Diego County, as the commercialization-side door already named in that plan’s pipeline language; and DGS, for the state excess sites.

First small step. Put “Redeem the Brawley Plant: site inventory and one-year emergency report” on a public Imperial County agenda, and we can ask the Southern Border Coalition to hear it under its circular-economy strategy.

One positive action. We can ask the Imperial County Board of Supervisors to put “Redeem the Brawley Plant: site inventory and one-year emergency report” on a public agenda, and the Southern Border Coalition to hear it under its circular-economy strategy.

Draft material hub site proposal

Draft only. These are options to weigh as a whole; none chosen. There is no ranking and no favorite. Rows are grouped by kind (existing facility, idle government property, public listing), not a preference. A property on a list is a lead, not an offer. No board, collaborative, college, owner or seller named here has endorsed KOEB. No seller or agency is contacted here. We The People can ask officials to fix the problem. Nothing here is a money ask. No material hub is open.

Hub site options for Southern Border — side by side, none chosen
OptionSize / what’s on the recordStatusWhat’s unknown ⚠
Existing idle plant / facility — Brawley (Spreckels) site, also listed for sale395 W. Keystone Road, Brawley, CA 92227. Listing claims 1,276± acres and 267,916 SF of processing and support structures ⚠ (Cushman & Wakefield Land Advisory Group page, rechecked Nov 19, 2026, PT; same figures already on file from Nov 16–17, 2026). No asking price is published ⚠.Decommissioned sugar-processing facility, offered for sale as adaptive reuse. Closed July 2025 (USGS Mineral Commodity Summaries 2026, already on file). Rechecked Nov 19, 2026, PT. Spreckels Sugar — Brawley listing (link returned HTTP 200 when checked Nov 19, 2026, PT)Kiln, hydrators, silos and related equipment still on site unverified ⚠ (an equipment sale was announced in October 2025, already on file). Listing acreage and square footage are broker claims, not a survey ⚠; not visited.
Idle government property already on this card144 local surplus parcels (113 vacant; 477 acres); 2 state excess sites (419.7 acres); 7 federal idle assets; San Diego NTC 51 BRAC acres (CRS, Apr 25, 2019 ⚠).Leads on public lists only (HCD Table H 2025; DGS last edited Oct 29, 2026; FRPP FY2025 as of Sept 30, 2025, our grouping ⚠).No specific parcel is selected; list rules; underlying list pages were not re-read on Nov 19, 2026 ⚠.
Public listing example — 105 S 31st St, San Diego, CA 9211317,836 SF industrial building. Asking price $4,994,000.Listed for sale on LoopNet when checked Nov 19, 2026, PT. 105 S 31st St listing (link returned HTTP 403 when checked Nov 19 and Nov 20, 2026, PT)Zoning and power not checked ⚠; not visited; listings change. LoopNet pages returned HTTP 403 when fetched Nov 19 and Nov 20, 2026, PT; the link is kept with that note, and size and price are from the public listing card in search results ⚠.

⚠ Listings change; a listing is a lead, not an offer; not visited; zoning and power are not checked except where a listing or an earlier KOEB file already states them. Checked Nov 19, 2026, PT.

We can ask. We can ask the Imperial County Board of Supervisors, and the Southern Border Coalition, as a public door to put a public comparison of these hub-site options on an agenda — as a whole, with no site favored in advance.

Every town is a materials node

What’s your local material?

Tell us your town’s material, or which product your town needs. That helps decide what we study first.

Write kingdomonearthbuilders@gmail.com Planned products on MII’s site

Nothing here is for sale. No lab is open yet, and no dates are set.

Why this work exists

Our mission

This is cluster.KOEB, the Kingdom On Earth Builders clusters site. We build for our neighbors. Through Hemp For Victory 2.0, We The People are working to bring back the American Dream by turning locally grown and clean recycled materials (not hemp-only) into many products, and those products into homes, with prosperity for all as our goal. Scalable Manufacturing Cluster Model, Starting from California. For materials intelligence and academies, see MII (Material Intelligence Institute) — its own site.

See our mission

Sources & Notes

Compiled Thu Nov 19, 2026, PT, from KOEB drafts dated Nov 17, 2026. Figures on this page are as compiled in those drafts. This public copy was prepared Nov 20, 2026, PT, with internal file paths removed. Underlying CAL FIRE, Cal OES, CDFA, CalRecycle, EDD, crop-report and college pages were not re-read on Nov 19 or Nov 20, 2026 ⚠, except that public URLs listed below were status-checked on Nov 19, 2026 and re-checked Nov 20, 2026, PT (HTTP 200 unless noted). The DOL OA Bulletin 2013-07 PDF did not load from this machine on Nov 19 or Nov 20, 2026 ⚠ (HTTP 403).

Priority needs and draft proposals on the region cards (added Nov 19, 2026, PT) use only figures and plan language already on this page or in the Nov 17, 2026 regional drafts, the idle-properties map, and the fire and restoration drafts. They are desk proposals, not approved plans. Regional RHNA housing allocations were ⚠ not compiled in these drafts. Unemployment figures are September 2026, not seasonally adjusted, and are county rates, not regional averages. Some Batch A unemployment figures were read from a search snapshot of EDD Report 400C ⚠.

Charts on this page (drawn Nov 19, 2026, PT) use only figures already on the page or in its source drafts, except that The Mycelium Manufacturing Network map uses the U.S. Census Bureau Cartographic Boundary File cited below for the state outline. Each chart has a caption with its source and date. Our regional grouping and arithmetic are marked ⚠. Scales start at zero. Parcels, sites, assets and acres are never plotted on one shared axis. Registered hemp acres are not harvested acres. Fire bars are examples, not every fire.

KOEB drafts used (opened Nov 19, 2026, PT):

Public sources cited in those drafts (dates as in the drafts, unless noted):

Idle properties and the “fix the problem” package (drafts opened Nov 19, 2026, PT; figures as compiled Nov 17, 2026; underlying agency pages not re-read this pass ⚠):

Limits. This is not an offer, a permit, a feedstock claim, a partnership, or legal advice. A property on a list is a lead, not an offer. No site is chosen, except that the Mendota hub is named as in due diligence only. County recycled tonnage by material is ⚠ not measured in most counties. Registered hemp acres are not harvested acres. Crop-value figures are as reported in the cited crop reports; they are not the same as available residue tons. Fire examples are not a complete list, and some acres come from a mirrored top-20 PDF ⚠. Kern County and Orange County have no documented land-damage item yet ⚠.